PRE-OPERATION INSPECTION
UNSAFE OPERATION HAZARD
Be sure to follow the instructions and
safety rules in this manual. Failure to
follow the instructions and safety
rules in this manual may result in
death or serious injury.
Do not operate this machine unless
you have learned and practiced the
rules for safely operating the ma-
chine as stated in this manual.
•
Know and understand the safety
rules before continuing the next
step.
•
Avoid dangerous situations.
•
Always check the machine before
operating.
•
Select appropriate machinery and
personal protective equipment
(hard hats, safety belt and gloves,
etc.) for the task.
•
Always perform a pre-operation
inspection.
•
Always perform a pre-operation
function test before using the
machine.
•
Check the work site.
•
Check the safety decals/ name-
plates on the machine.
•
Only use the machine according
to the instructions in this manual
and for its intended purpose.
TIPS FOR CONDUCTING A
PRE-OPERATION
INSPECTION
•
The operator is responsible for performing the “pre-
operation inspection” and routine maintenance as
stated in this manual.
•
Before each shift change, the operator must con-
duct a pre-operation inspection to find out whether
the machine has obvious problems before the oper-
ator performs a pre-operation function test.
•
The pre-operation inspection also helps the operator
determine whether the machine requires routine
maintenance.
•
See the list of machine components on
. Check the machine for
any modified, damaged, loose or missing parts.
•
Never use a machine that has damaged or modified
parts. Mark the machine and stop using the machine
if you discover damage or modifications.
•
Only qualified maintenance technicians can repair
the machine according to the manufacturer's regula-
tions. After any maintenance, the operator must per-
form another pre-operation inspection before
conducting a pre-operation function test.
•
Qualified maintenance technicians must perform
regular maintenance inspections according to the
requirements in the manufacturer’s
Maintenance
Manual
.
TIPPING HAZARD
Do not change or modify the aerial
work platform without the prior writ-
ten permission of the manufacturer. If
an additional device is installed on
the platform or guardrail for placing
tools or other materials, this will in-
crease the platform weight and sur-
face area or increase the load.
CONDUCTING A PRE-
OPERATION INSPECTION
Before starting the machine, check whether it meets the
following requirements:
•
Ensure the
Operation Manual
and
Maintenance
Manual
are in good condition, legible and stored in
the storage compartment on the platform.
•
Make sure all labels are legible and appropriately
located.
•
Check for hydraulic oil leaks. Check for proper oil
level. Add oil as needed. See
.
Содержание GTJZ0612
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank ...
Страница 8: ...This Page Intentionally Left Blank ...
Страница 12: ... Jul 2020 iv GTJZ0612 0812 1012 1212 Operation Manual This Page Intentionally Left Blank ...
Страница 34: ... Jul 2020 4 2 GTJZ0612 0812 1012 1212 Operation Manual This Page Intentionally Left Blank JOBSITE INSPECTION ...
Страница 55: ...TRANSPORTING AND LIFTING THE MACHINE GTJZ0612 0812 1012 1212 Operation Manual 8 3 Jul 2020 Figure 8 4 ...