background image

© 2017-2020     LBC BAKERY EQUIPMENT, INC. TULALIP, WA

                                        PG 1 

                                           REV 12/2020

 

 

     

         

                                                         

 

Models LCR5 and LCR7 

5-Spit and 7-Spit Rotisserie Ovens 

Installation, Service and Parts Manual 

 

LBC Bakery Equipment, Inc. 

6026 31

st

 Ave NE 

Tulalip, WA 98271, USA 
Phone:  888-RACKOVN (888-722-5686) 
Fax:  425-642-8310 

                                     

Email:  

[email protected]

 

                                    

Website:  

www.lbcbakery.com

                     

  

 

 

 

 

 

 

Содержание LBC LCR5

Страница 1: ...2020 Models LCR5 and LCR7 5 Spit and 7 Spit Rotisserie Ovens Installation Service and Parts Manual LBC Bakery Equipment Inc 6026 31st Ave NE Tulalip WA 98271 USA Phone 888 RACKOVN 888 722 5686 Fax 425 642 8310 Email parts lbcbakery com Website www lbcbakery com ...

Страница 2: ...ified personnel and all such operations maintenance and repair must be performed in a diligent manner It is the responsibility of the owner operator to ensure proper training and diligence of any person coming into contact with either the subject units or the output product fumes or otherwise of the subject units It is the responsibility of the owner operator to ensure that the subject units are i...

Страница 3: ...TABLE of CONTENTS T Read First 2 Specifications 4 Configurations 5 Conditions of Installation 6 Receiving and Unpacking 7 Installation 8 Controller Operation 11 Parts List 12 Wiring Diagram 17 Warranty 19 ...

Страница 4: ... Freight Class LCR5 32 5 31 5 21 7 26 3 27 1 24 3 320 lbs 450 lbs 85 LCR7 38 4 38 9 26 5 32 6 32 6 31 6 460 lbs 610 lbs 85 Model Voltage kW Min Circuit Ampacity Max Breaker Size 1 Phase 3 Phase 1 Phase 3 Phase LCR5 208 VAC 4 0 40 N A 60 N A LCR7 208 VAC 9 0 N A 40 N A 60 ...

Страница 5: ...with Brakes Rotisserie Countertop or Floor Mount Stand Mount LST5 Stand for LCR5 Rotisserie or LST7 Stand for LCR7 Rotisserie or LHC7 Holding Cabinet Combinations 2 ea LCR5 Rotisseries 2 ea LCR7 Rotisseries 1 ea LCR7 Rotisserie 1 ea LHC7 Holding Cabinet NOTE When a Rotisserie is stacked with a Holding Cabinet It may be installed on the top or bottom ...

Страница 6: ...up and training are not included IN ALL CASES THE ELECTRICAL MECHANICAL CONNECTIONS AND VENTILATION MUST MEET ALL FEDERAL STATE AND LOCAL CODES OR ORDINANCES It is the responsibility of the owner operator to do the following A Secure all required permits and meet all local code requirements B Ensure the installation site is cleared and ready for installation before the authorized installer arrives...

Страница 7: ...or loss means damage or loss which does not become apparent until the merchandise has been unpacked If concealed damage or loss is discovered upon unpacking make a written request for inspection by the carrier s agent within 15 days of delivery All packing material should be kept for the inspection DO NOT return damaged merchandise to LBC Bakery Equipment you must file your claim with carrier Loca...

Страница 8: ... The installation location must allow adequate clearances for servicing and for the proper operation of the loading door s Legs Casters or Stand Legs or casters are available for single and stacked appliance combinations Additionally a single unit may have a stand install the appliance on legs casters or a stand with the stainless steel hardware provided 16 ea of the following 10 1 2 x 20mm hex bo...

Страница 9: ...e end of the tether to a secure structure and affix the warning label provided WARNING ATTENCION RISK OF ELECTRIC SHOCK to the control side panel Interim Inspection Prior to turning oven on verify the following Loading door s open close freely past 90o without obstruction All packing materials have been removed from inside oven Carousel wheel shipping ties at left hand carousel support hub and or ...

Страница 10: ...rom o F to o C and back Controller Calibration Insert a thermocouple inside the appliance cook chamber at the center of any oblong hole in the fan cover Route the probe wire out of the loading door opening and adjust the oven set point to 350o F 177o C Allow the oven to reach the set point and stabilize for at least 90 minutes If the thermocouple reading and the controller actual temperature diffe...

Страница 11: ...nge scale from o F to o C and back Timer Start Stop and Reset Button Press to start stop timer press and hold for 3 seconds to reset timer Jog Button Press and hold this button to rotate carousel position when loading door is open Cook Event Buttons Use these when creating a recipe up to 3 events may be programmed NOTE To ignore sear and or roast events enter a time of 00 00 for that event Recipe ...

Страница 12: ...free at 1 888 722 5686 C A U T I O N USE OF ANY REPLACEMENT PARTS OTHER THAN THOSE SUPPLIED BY LBC OR THEIR AUTHORIZED DISTRIBUTORS CAN CAUSE BODILY INJURY TO THE OPERATOR AND OR DAMAGE TO THE APPLIANCE AND WILL VOID ALL WARRANTIES BOTH HIGH AND LOW VOLTAGES ARE PRESENT INSIDE OF THIS APPLIANCE WHEN THE UNIT IS PLUGGED WIRED INTO A LIVE RECEPTACLE BEFORE REPLACING ANY PARTS DISCONNECT THE UNIT FRO...

Страница 13: ...13 PARTS LIST Part 2 of 5 W ...

Страница 14: ...it rear door only Loading Door Outer Front 1 71300 31F 7 Spit front door only Loading Door Outer Rear 1 71300 31R 7 Spit rear door only 20 Element 2kW 208 VAC 2 11090 37 5 Spit only Element 3kW 208 VAC 2 11090 38 7 Spit Washdown Element 3kW 208 VAC 0 or 1 11090 39 7 Spit only Element 2kW 208 VAC 2 or 3 11090 40 7 Spit 1 phase only 21 Capacitor Fan 2 2μF 2 40704 11 22 Thermocouple Temperature Senso...

Страница 15: ...1 180 768 1C 5 Spit only Carousel Assembly Stainless Steel 1 180 768 1 5 Spit only Carousel Assembly Non Stick Coating 1 180 768 2C 7 Spit only Carousel Assembly Stainless Steel 1 180 768 2 7 Spit only 65 Angle Spit Stainless Steel 5 LCR5 SV 5 Spit Only Angle Spit Non Stick Coating 5 LCR5 SV C 5 Spit Only Angle Spit Stainless Steel 7 LCR7 SV 7 Spit Only Angle Spit Non Stick Coating 7 LCR7 SV C 7 S...

Страница 16: ...r Teflon 1 6 70200 14 Washer Friction 1 7 180 480 Bracket Motor Brake Solenoid 1 8 70403 04 1 240 Solenoid Laminated 1 9 Gearbox Gearbox Rotisserie 1 10 SCREW PH SS M3 5 x 0 6 x 50mm PH SS SCREW M3 5 x 0 6 x 50mm 1 11 Stock Part Screw Truss SS M5 x 10mm 2 12 Screw M3 5 Screw M3 5 Drive Motor Cap 3 13 Stock Part Screw PH SS DrillTip Phil 8 18 1 2 4 14 Stock Part Washer M7 5 Drive Motor to Gearbox A...

Страница 17: ...17 WIRING DIAGRAM Part 1 of 2 ...

Страница 18: ...18 WIRING DIAGRAM Part 2 of 2 n ...

Страница 19: ...19 ...

Отзывы: