Refer to the following table for status of DC-DC converter.
Table 7-1 Status of DC-DC converter
Status
Condition
Running mode
Powere
d off
PV,Battery switch disconnected
The lights on the equipment are all out.
Powere
d up
PV,Battery switch connected
The power on the equipment is on.
RUN
the device receives startup command
RUN green light in front door is always
on, and the module green light is
always on.
Faults
Any fault information
Red light is always on, the module red
light is always on or flickers, and the
buzzer makes an alarm.
Shutdo
wn
The device receives shutdown command.
RUN green light flickers slowly, and the
module green light flickers slowly.
8 Operation
8.1 Safety during Operation
DC side operation is disturbed due to incorrect parameter settings
When setting the mode of the AC side, please make sure that the control parameter is consistent with the
grid requirement.
8.2 Power On Procedure
Power on for the first time:
1): Confirm the PV and BATTERY cable firmly connected according to the check list in the Installation
Manual.
2): Measure the insulation withstand voltage according to the international or local standard. The following
insulation withstand voltage should be measured
Positive pole “+” to ground “GND”; Negative pole “-” to ground “GND”.
3): Measure the PV voltage; Battery DC voltage;
4): If the PV voltage
,
Battery DC voltage within the normal range as shown in technical specifications, then