4.8
Preventative Maintenance Inspections
It is recommended that regular preventative maintenance inspections (PMIs) be carried out
on the Quikstak. This helps ensure operator safety and extend the service life of the machine.
The Quikstak PMI schedule is divided into three parts: weekly, quarterly, and annual
inspections. The relevant procedures are provided below, along with log sheets for
documenting each inspection.
Operators should immediately stop using the Quikstak and request an inspection if any
fault, failure, or abnormal operation is observed.
In the United Kingdom, the Lifting Operations and Lifting Equipment Regulations 1998
specifies that all workplace lifting equipment be subject to ‘thorough inspection’
at
regular intervals. These inspections are sometimes known as LOLER checks. The following
section may be used to demonstrate conformance with UK LOLER regulations.
4.8.1
Pre-inspection checklist
1.
Wear suitable Personal Protective
Equipment (PPE), including safety
boots and protective eyewear.
2.
Ensure there are no ignition sources
within two metres of the stacker.
3.
Remove the pallet or load and
lower the forks to the ground.
4.
Turn off the key switch and unplug
the charging lead.
5.
Remove the powerpack cover.
6.
Clean the powerpack and electric
circuitry with compressed air.
7.
Always use height safety
equipment when servicing
elevated areas.
4.8.2
Inspection checklist
The following checklist includes the procedures for weekly, quarterly, and annual PMI
inspections. The columns on the right indicate the interval for each item.
Category No. Item
Procedure
W
ee
kly
Q
ua
rter
ly
A
nn
ua
lly
Overall
1
Frame
Inspect the frame for damage and
corrosion
✅
✅
2
Decals
Check that all instruction and warning
decals are affixed and legible
✅
✅
✅
Electrical
Systems
3
Operating
Controls
Check that the operating controls function
correctly, per
✅
✅
✅
4
Crush Safety
Button
Check that the crush safety button functions
correctly, per
✅
✅
✅
5
Horn
Check that the horn
functions correctly, per
✅
✅
✅
6
Indicators
Check that the battery indicator
hour meter and charger status LED all
function correctly, per
✅
✅
✅
7
Wiring looms
Visually inspect wiring for obvious damage,
broken or loose connections
✅
Содержание QUIKSTAK QS10MM
Страница 1: ...User Manual Quikstak QS10MM Original Instructions English v52 0 April 2022 USER MANUAL...
Страница 3: ...User Manual Quikstak QS10MM Original Instructions English v52 0 April 2022 Page 2...
Страница 26: ...4 4 9 Wiring diagram C O N TR O L L ER C U R TIS1212...
Страница 34: ...4 8 3 Inspection log sheets Date Name Location Checks complete Maintenance carried out Parts used...
Страница 36: ...Date Name Location Checks complete Maintenance carried out Parts used...