![Simoco SDB680 Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/simoco/sdb680/sdb680_installation-manual_1275637054.webp)
9 BASE CONFIGURATION TIER III TO TIER II
This Procedure should be followed when configuring a Tier III Base Sta-
tion into a Tier II SDB680 Base Station.
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED
The following Tools, Test Equipment and Materials will be required to perform this
procedure:
PC with the following Software Applications installed:
SDMT
Simoco IP Configuration Tool
Notes
(i). The software applications listed above are available for download on the Simoco
website http://www.simocowirelesssolutions.com via the Partner Portal. To access
the Partner Portal a Username and Password will be required.
(ii). To request access to the partner portal please contact your local business
development manager or alternatively contact the relevant Simoco Customer
Services (see Support Page for details).
9.1. TIER II BASE PREREQUISITES
Before commencing this procedure to configure a Tier III Base Station into a Tier II
Base Station, it is assumed that the base station has already been fitted into a rack and
is connected to the relevant system.
It as also assumed that the SDMT and Simoco IP Configuration Tool software
applications have been installed on a PC and have previously been used.
9.2. IP ADDRESS CONFIGURATION
1. If the relevant base station has already been allocated an IP address, note the IP
address.
2. If the relevant base station has not been allocated an IP address, carry out the
IP address configuration as described below.
3. Ensure that the PC is connected to the Ethernet switch via a CAT 5 Ethernet
cable and the PC has a fixed IP address in the same subnet as the bases.
4. On the PC, start the Simoco IP Configuration Tool.
Doc Number:
TNM-I-E-0046 ISSUE 1.2
Page
54