Installation Guide

Installation Guide

168 mm

Solar LUA

SAFETY FIRST

INSTALLATION 

Ensure that the site is surveyed for buried services and that 

Ensure that the site is surveyed for buried services and that 

any electrical supply is isolated before commencing work.

any electrical supply is isolated before commencing work.

All materials to be handled using suitable mechanical equip-

All materials to be handled using suitable mechanical equip-

ment or suffi  cient manpower for the weight of the item being 

ment or suffi  cient manpower for the weight of the item being 

handled.

handled.

TOOLS & MATERIALS REQUIRED

Tri-head Key.   

Tri-head Key.   
5mm Allen key.

5mm Allen key.
Electrical Screwdriver.

Electrical Screwdriver.

PACKING LIST

Box 1 - Solar panel
Box 2 - LED LUA
Box 3 - Solar Panel support,LUA Bracket, battery and regulator.

Side Cutters

Side Cutters
13mm spanner

13mm spanner
Ø14mm drill

Ø14mm drill

1

The Solar LUA is 

supplied as a kit 

designed to fi t onto a 

pre-installed 89/168 

column. The column 

manufacturer should 

be consulted to 

provide a column and 

foundation plan suit-

able for the equip-

ment to be mounted 

and environmental 

conditions peculiar to 

the site.

Weights and dimen-

sions of the solar LUA 

equipment are shown 

overleaf to help with 

calculating the loads.

Slide the LUA through-bracket 

over the top of the post and 

down to align with the drilled 

hole. 

Lock this in place with the sup-

plied M8 x 48 socket set screw.

  

3

Fix the sign to be illuminat-

ed onto the post in its fi nal 

position.  

Mark and drill a 14mm cable 

entry hole in the post 168 

mm from the top of the sign 

and in line with its centre.

For a double sided instal-

lation repeat on the other 

side of the post. 

De-bur and surface protect 

the bare faces of the drilled 

hole. 

 

Assemble the solar panel support by 

uncoiling the solar panel output lead 

and feeding it through the panel support 

bracket as shown.

Place the bracket over the aperture in 

the panel back moulding and secure 

with the 4 Tri-head screws supplied.

 

2

Solar panel 
output lead

Panel back 
moulding

Panel support 
bracket

4

6

Fix the Solar LUA sign-light to 

the through-bracket following 

the instructions supplied with 

the LUA. 

Pass the LUA supply cable 

down the post  via the drilled 

hole and into the column base 

housing

 

Repeat this step for a double 

sided installation.

Take the solar panel assembly 

and feed the solar output 

lead down the post from the 

top so that it emerges in the 

column base housing.

Place the solar panel assem-

bly on the top of the post and 

align it to point directly South. 

Ensure that nothing impedes 

the solar panels view of the 

sun.

Tighten the grub screws to 

lock the solar panels assem-

bly onto the post.

5

Doc Ref : IG196

Issue Date: January 2020

Issue Number : 2

Отзывы: