31
Starting and operation
Initial
The fi rst operation of the substation must be carried out by qualifi ed technical personnel.
Successively, if it is necessary to start up the substation again, adhere strictly to the fol-
lowing instructions:
Check that the district heating circuit is open
1.
.
Switch on the I-O button and it will light (
2.
fi g.16. Switch lights.
To off set the substation in “Summer” and wait a minute. Place the switch in position (O).
The light will turn off.
Fig. 16
Winter / summer
mode
This is a device that allows to change mode functioning:
•
“Summer“ mode produces only DHW.
•
“Winter“ mode produces DHW and heating.
Select the desired mode (fi g. 15).
Fig. 15
Содержание SIME SUB HE/DHW 12/60
Страница 1: ...Sime Sub HE DHW ISO 9001 2000 CERTIFIED COMPANY EN...
Страница 30: ...33 Certifications...