Preinstallation Activities
Perform all of the preinstallation activities before you receive your system. You can
complete the following preinstallation activities days or weeks before the installation:
•
Verify the site plans.
•
Ensure that you have the appropriate tools necessary to complete the installation
process.
•
Ensure that the correct power receptacle is installed and properly wired.
These activities are explained in the subsections that follow.
Site Plan Verification
Ensure that all site requirements are met before your system arrives. If you have
questions about the site requirements or would like to order full-size floor templates for
your site, send an e-mail message to [email protected]. You can also contact a site planning
representative by telephone at +1 715 726 2820.
Содержание Origin 300
Страница 1: ...SGI Origin 300 System with NUMAlink Module User s Guide 007 4498 002 ...
Страница 4: ......
Страница 26: ......
Страница 35: ...Base System Components 007 4498 002 9 Figure 1 7 Front and Rear Views of an SGI Origin 300 Base Module ...
Страница 39: ...Base System Components 007 4498 002 13 Figure 1 10 L2 Controller ...
Страница 49: ...Optional System Components 007 4498 002 23 Figure 1 17 SGI TP9400 Storage System ...
Страница 54: ...28 007 4498 002 1 Introduction Figure 1 18 Tape Drive Libraries L20 L40 L80 L180 L700 ...
Страница 71: ...Installing Your System 007 4498 002 45 Figure 2 5 Removing a Short Rack from the Shipping Crate Peg ...
Страница 78: ......
Страница 93: ...Disk Drives 007 4498 002 67 Figure 3 11 Installing a Disk Drive c Bezel door Disk drive Bezel door a b d ...
Страница 118: ......
Страница 264: ......