![Silicon Graphics Origin 300 Скачать руководство пользователя страница 113](http://html.mh-extra.com/html/silicon-graphics/origin-300/origin-300_user-manual_1271648113.webp)
Powering Your System On and Off
007-4498-002
87
Figure 3-26
PDU Circuit Breaker Switch
3. Set the power switch(es) of the TP900 storage module(s) to the On position.
4. Verify that all of the L1 controllers display “L1 running.” If any L1 controllers are
not running, contact your SGI system support engineer (SSE).
5. Press the power buttons that are located on the front of the modules that you want
to power on. Always power on the PCI expansion modules first. Next, power on the
NUMAlink module. Last, power on the Origin 300 base modules starting with the
global master (the lowest base module in the rack).
The power-button LEDs illuminate when the modules are powered on.
Power
distribution
unit (PDU)
Circuit breaker switch
Содержание Origin 300
Страница 1: ...SGI Origin 300 System with NUMAlink Module User s Guide 007 4498 002 ...
Страница 4: ......
Страница 26: ......
Страница 35: ...Base System Components 007 4498 002 9 Figure 1 7 Front and Rear Views of an SGI Origin 300 Base Module ...
Страница 39: ...Base System Components 007 4498 002 13 Figure 1 10 L2 Controller ...
Страница 49: ...Optional System Components 007 4498 002 23 Figure 1 17 SGI TP9400 Storage System ...
Страница 54: ...28 007 4498 002 1 Introduction Figure 1 18 Tape Drive Libraries L20 L40 L80 L180 L700 ...
Страница 71: ...Installing Your System 007 4498 002 45 Figure 2 5 Removing a Short Rack from the Shipping Crate Peg ...
Страница 78: ......
Страница 93: ...Disk Drives 007 4498 002 67 Figure 3 11 Installing a Disk Drive c Bezel door Disk drive Bezel door a b d ...
Страница 118: ......
Страница 264: ......