Silicon Graphics ICE XA Скачать руководство пользователя страница 23

Powering the System On and Off

007-6399-002

5

When using the SGI cluster manager software, you can monitor and manage your server from a 
remote location. See the 

SGI Management Center Administration Guide for Clusters

(P/N 007-6358-00x). 

Preparing to Power On

To prepare to power on your system, follow these steps:

1. Check to ensure that the cabling between the rack’s power distribution units (PDUs) and the 

wall power-plug receptacle is secure.

2. Setting the circuit breakers on the PDUs to the “On” position will apply power to the blade 

enclosure supplies and will start the chassis manager board in each enclosure. 

Tip:  

The chassis manager in each blade enclosure will stay powered on as long as there is 

power coming into the unit. Turn off the PDU breaker switch that supplies voltage to the 
enclosure if you want to remove all power from the enclosure.

3. If you plan to power on a server that includes optional mass storage enclosures, make sure 

that the power switch on the rear of each PSU/cooling module (one or two per enclosure) is 
in the 

1

 (on) position. 

4. Make sure that all PDU circuit breaker switches (see the examples of I/O-rack PDUs in 

Figure 1-3 on page 6, and Figure 1-4 on page 7) are turned on to provide power when the 
system is booted up.

Содержание ICE XA

Страница 1: ...SGI ICE XA System Hardware User Guide Document Number 007 6399 002 ...

Страница 2: ...ommercial computer software subject to the provisions of its applicable license agreement as specified in a 48 CFR 12 212 of the FAR or if acquired for Department of Defense units b 48 CFR 227 7202 of the DoD FAR Supplement or sections succeeding thereto Contractor manufacturer is SGI 900 North McCarthy Blvd Milpitas CA 95035 TRADEMARKS AND ATTRIBUTIONS SGI and the SGI logo are registered trademar...

Страница 3: ...007 6399 002 iii Record of Revision Version Description 001 May 2015 First release 002 July 2015 Second release covering updated cpower commands ...

Страница 4: ......

Страница 5: ... 1 Operation Procedures 1 Precautions 1 ESD Precaution 1 Safety Precautions 2 Console Connections 3 Powering the System On and Off 4 Preparing to Power On 5 Powering On and Off 8 Console Management Power cpower Commands 8 Monitoring Your Server 12 Chassis Management Monitoring and Control 12 PCIe Subsystem Control 13 2 System Management 15 Using the 1U Console Option 17 Levels of System and Chassi...

Страница 6: ...andwidth Overview 28 Blade Memory Features 29 Blade DIMM Memory Features 29 DIMM Bandwidth Factors 29 Memory Channel Recommendation 30 System InfiniBand Switch Blades 30 System Features and Major Components 31 Modularity and Scalability 31 System Administration Server 32 Rack Leader Controller 33 Multiple Chassis Manager Connections 33 The RLC as Fabric Manager 34 Service Nodes 35 Login Server Fun...

Страница 7: ... XA Series D Rack 42U 46 ICE XA D Rack Technical Specifications 49 SGI ICE XA E Cell Rack Assemblies 50 E Cell Functional Overview 51 E Cell Compute Rack Specifications 51 E Cell Cooling Rack Specifications 52 Cooling Distribution Unit CDU Rack Specifications 53 5 SGI ICE XA Administration Leader Servers 55 Overview 56 System Hierarchy 56 Communication Hierarchy 57 1U Rack Leader Controller and Ad...

Страница 8: ... B Safety Information and Regulatory Specifications 71 Safety Information 71 Regulatory Specifications 73 CMN Number 73 CE Notice and Manufacturer s Declaration of Conformity 73 Electromagnetic Emissions 73 FCC Notice USA Only 74 Industry Canada Notice Canada Only 74 VCCI Notice Japan Only 75 Chinese Class A Regulatory Notice 75 Korean Class A Regulatory Notice 75 Shielded Cables 76 Electrostatic ...

Страница 9: ...w of a 1U Service Node 35 Figure 3 6 2U Service Node Front and Rear Panel Example 36 Figure 3 7 SGI Remote Solutions Process Overview 41 Figure 4 1 D Rack Front Lock Example 47 Figure 4 2 Optional Water Chilled Door Panels on Rear of ICE XA D Rack 48 Figure 4 3 E Cell Rack Configuration Example 50 Figure 4 4 E Cell Rack Assembly Example CDU on Left 54 Figure 5 1 SGI ICE XA System Administration Hi...

Страница 10: ...x 007 6399 002 List of Figures Figure A 1 Ethernet Port 70 Figure B 1 VCCI Notice Japan Only 75 Figure B 2 Chinese Class A Regulatory Notice 75 Figure B 3 Korean Class A Regulatory Notice 75 ...

Страница 11: ...pecifications 51 Table 4 3 SGI ICE XA E Cell Cooling Rack Specifications 52 Table 4 4 SGI ICE XA Cooling Distribution Unit CDU Specifications 53 Table A 1 SGI ICE XA Series Configuration Ranges 65 Table A 2 ICE XA System D Rack Physical Specifications 66 Table A 3 Environmental Specifications Single D Rack 67 Table A 4 SGI ICE XA E Rack Physical Specifications 68 Table A 5 Environmental Specificat...

Страница 12: ......

Страница 13: ...tten with the assumption that the reader has a good working knowledge of computers and computer systems Important Information Warning To avoid problems that could void your warranty your SGI or other approved service technician should perform all the setup addition or replacement of parts cabling and service of your SGI ICE XA series system with the exception of the following items that you can pe...

Страница 14: ...rack leader and other support server nodes An outline of the server functions is also provided Chapter 6 Basic Troubleshooting provides recommended actions if problems occur on your system Chapter 7 Maintenance Procedures covers end user service procedures that do not require special skills or tools to perform Procedures not covered in this chapter should be referred to SGI customer support specia...

Страница 15: ...y as an optional service node for login batch MDS or other service node purposes This server is not used as a system RLC or administrative server SGI Rackable C2112 GP2 System User Guide P N 007 6362 00x This guide covers general operation installation configuration and servicing of the 2U Rackable C2112 GP2 server node used in the SGI ICE XA system The 2U server can be used as a service node for ...

Страница 16: ...ut software and documentation in this release are in a file named README SGI in the root directory of the SGI ProPack for Linux distribution media You can also view man pages by typing man title on a command line SGI systems include a set of Linux man pages formatted in the standard UNIXA man page style Important system configuration files and commands are documented on man pages These are found o...

Страница 17: ...that a preceding element can be repeated man page x Man page section identifiers appear in parentheses after man page names GUI element This font denotes the names of graphical user interface GUI elements such as windows screens dialog boxes menus toolbars icons buttons boxes fields and lists Product Support SGI provides a comprehensive product support and maintenance program for its products as f...

Страница 18: ... comments Online the document number is located in the front matter of the manual In printed manuals the document number is located at the bottom of each page You can contact SGI in the following ways Send e mail to the following address techpubs sgi com Contact your customer service representative and ask that an incident be filed in the SGI incident tracking system SGI values your comments and w...

Страница 19: ...ions Before operating your system familiarize yourself with the safety information in the following sections ESD Precaution on page 1 Safety Precautions on page 2 ESD Precaution Caution Observe all electro static discharge ESD precautions Failure to do so can result in damage to the equipment Wear an approved ESD wrist strap when you handle any ESD sensitive device to eliminate possible damage to ...

Страница 20: ... warning labels Caution Power off the system only after the system software has been shut down in an orderly manner If you power off the system before you halt the operating system data may be corrupted Warning If a lithium battery is installed in your system as a soldered part only qualified SGI service personnel should replace this lithium battery For a battery of another type replace it only wi...

Страница 21: ...drawer closed when the console is not in use and prevents it from accidentally sliding open 2 Handle Used to push and pull the module in and out of the rack 3 LCD Display Controls The LCD controls include On Off buttons and buttons to control the position and picture settings of the LCD display 4 Power LED Illuminates blue when the unit is receiving power 1 2 3 4 Figure 1 1 Flat Panel Rackmount Co...

Страница 22: ...through the RS 232 port is disabled Check with your service representative if use of an RS 232 terminal is required for your system The flat panel rackmount or other optional VGA console connects to the administration controller s video VGA and USB connectors on the back of the system see Figure 1 2 VGA Port Ethernet LAN Ports IPMI LAN Port USB Ports COM Port UID Power Supplies 2 Figure 1 2 Admini...

Страница 23: ... the blade enclosure supplies and will start the chassis manager board in each enclosure Tip The chassis manager in each blade enclosure will stay powered on as long as there is power coming into the unit Turn off the PDU breaker switch that supplies voltage to the enclosure if you want to remove all power from the enclosure 3 If you plan to power on a server that includes optional mass storage en...

Страница 24: ...Power distribution unit PDU Power source 6 007 6399 002 1 Operation Procedures Figure 1 3 Eight Outlet Single Phase PDU Example Figure 1 4 on page 7 shows an example of the three phase PDU ...

Страница 25: ...Powering the System On and Off 007 6399 002 7 Figure 1 4 Three Phase PDU Example ...

Страница 26: ... or single system components or individual racks The cpower command is as follows cpower option target_type action target_list Example cpower command arguments are listed and described in Table 1 1 See Table 1 2 on page 11 for examples of the cpower command strings Table 1 1 cpower option action target type and target list descriptions Argument Description Option h help Show this help message and ...

Страница 27: ...y Turns on the identifying LED of the target for the period specified by the i seconds option see the description in the Option portion of this table on Powers on the target by sending an IPMI power on command Valid target types are switch iru leader node and system If the target type is system leaders and compute nodes are powered on first then the ICE compute nodes are powered on off Powers off ...

Страница 28: ... reset on the target by sending an IPMI reset command Valid target types are leader and node The wait option is available for this action shutdown Shuts down the target but does not power it off by sending a shutdown h now command via ssh Waits for targets to shut down Valid target types are node leader and system Target_list Performs the listed action on all specified target types such as r1i n w...

Страница 29: ... halt r i n Shuts down halts all the blade enclosure compute nodes in the system but not the administrative controller server rack leader controller or other service nodes cpower system off and cpower system on Reboots all rack leaders and nodes in a system cpower node on r1i0n8 Command tries to specifically boot rack 1 IRU0 node 8 cpower leader status Determines the power status of all rack leade...

Страница 30: ...onsole management package These console connections enable you to view the status and error messages generated by your SGI ICE XA system You can also use these consoles to input commands to manage and monitor your system See the section System Power Status on page 17 for additional information Chassis Management Monitoring and Control There is one chassis management controller board CMC slot in ea...

Страница 31: ...ns on blades must be ordered from the factory or installed by trained service personnel Additional PCIe based I O sub systems are sited in the administrative controller server rack leader controller and service node systems used with the blade enclosures These are the most easily configurable I O system interfaces for the SGI ICE XA systems See the particular server s user guide for detailed infor...

Страница 32: ......

Страница 33: ...wer down of the blade enclosure s compute node blades and environmental monitoring of all units within the enclosure The CMC takes direction from the RLC and stays powered on as long as there is power applied to the blade enclosure Note that the stand alone service nodes use IPMI to monitor system health Mass storage enclosures are not managed by the SGI ICE XA system controller network Figure 2 1...

Страница 34: ...nitor Local Area Network LAN Local Area Network LAN Cat 5 Ethernet SGI ICE XA system admin and service node rack 16 007 6399 002 2 System Management Figure 2 1 SGI ICE XA System Admin and Service Node Network Access Example ...

Страница 35: ...ol The chassis management control network configuration of your ICE XA series machine will depend on the size of the system and the control options selected Typically any system with multiple blade enclosures will be interconnected by the chassis managers in each blade enclosure Note Mass storage option enclosures are not monitored by the blade enclosure s CMCs Chassis Controller Interaction In al...

Страница 36: ...nd adjust the activity of the cooling racks in an E Cell as well as the external cooling distribution unit CDU The CDU rack supplies liquid cooling to the individual blades within the E racks 48 port GigE switch 48 port GigE switch Stacking cables VLAN VLAN VLAN VLAN VLAN VLAN LAN1 LAN2 BMC LAN3 LAN4 LAN1 LAN2 BMC LAN3 LAN4 CMC 0 CMC 1 CMC 2 CMC 3 CMC 4 CMC 5 CMC 6 CMC 7 RLC node Customer LAN Syst...

Страница 37: ...cpower commands are communicating with BMCs using the IPMI protocol Note that the term IRU represents a single blade enclosure within a rack This is a legacy identification from the ICE individual rack unit IRU nomenclature Note that system level power up commands are applied first to service nodes then to RLCs then to blade enclosures and compute blades The cpower commands may require several sec...

Страница 38: ...not power off the system administration node server rack leader controller server or other service nodes See Console Management Power cpower Commands on page 8 for additional information on power on power off and power status commands The SGI Management Center Administration Guide for Clusters P N 007 6358 00x has more extensive information on these topics ...

Страница 39: ...ach of the up to nine compute blades supported in an enclosure are equipped with up to four two socket nodes with ASICs memory components and I O chip sets mounted on them The blades slide directly in and out of the enclosures Every processor socket on a blade supports dual inline memory module DIMM memory units using DDR4 bandwidths Optional PCIe slots hard disk or solid state SSD drives and MIC ...

Страница 40: ... shared memory system like that used in the SGI UV series of high performance compute servers Instead of passing pointers into a shared virtual address space parallel processes in an application pass messages and each process has its own dedicated processor and address space This chapter consists of the following sections System Models on page 22 SGI ICE XA System and Blade Architectures on page 2...

Страница 41: ...IB switch ASICs located in switch blades in the blade enclosure eliminate the requirement for external IB switches The InfiniBand technology provides for fast communication between compute blades within the same chassis and also between compute blades in separate enclosures Optional water chilled D rack cooling is available for support nodes and storage Note that ICE XA blade enclosures require li...

Страница 42: ...ack and typical support hardware that would be installed in the rack The rack would include single phase PDUs or optional three phase PDUs with enough outlets to support all the installed support hardware You can also add additional RAID and non RAID disk storage to your rack system and this should be factored into the number of required outlets An optional single phase PDU has 8 outlets and can b...

Страница 43: ...ional service node Optional storage units 1U Gig E switch Rack leader controller Admin server Service node 1U console kbd monitor System Models 007 6399 002 25 Figure 3 2 D rack Standard and Optional Components Example ...

Страница 44: ...ing fourteen data rate FDR InfiniBand embedded HCAs Single port IB HCA Dual port IB HCA Each of the two physical boards within the IP125 blade is divided into two logically independent compute nodes equipped with two processor sockets and eight DIMM slots Features of the IP125 blade include Eight Intel processors total within each blade The eight processors are cooled with liquid Cold Sink technol...

Страница 45: ...cture is described in more detail in the following paragraphs The compute blade contains the processors memory and uses two of the following fourteen data rate FDR InfiniBand embedded HCAs Single port IB HCA mezzanine cards one per dual socket node board Each of the two physical boards within the IP139 blade is a logically independent two processor compute node equipped with eight DIMM slots Featu...

Страница 46: ...A system node board is interconnected using two QuickPath Interconnect QPI links Each QPI link consists of two point to point 20 bit channels one send channel and one receive channel Each QPI channel is capable of sending and receiving at the same time on the same 20 bit channel The QPI link has a theoretical maximum aggregate bandwidth of 25 6 GB s using a 3 2 GHz clock rate and 38 4 GB s using a...

Страница 47: ... memory DIMM DIMM Bandwidth Factors Note the following factors regarding processors and DIMMs on a blade Different processor SKUs may support different maximum DIMM speeds such as 1866 or 2133 Each DIMM has a maximum operating frequency or speed regardless of the processor it is connected to or the number of companion DIMMs Each of the DIMMs on a blade s node board must be the same capacity and fu...

Страница 48: ...nd 18 ports from each ASIC for connecting to external targets The difference is in connectivity The premium switch has twice the external ports to use for expanding the topology and creating larger configurations with a higher bandwidth interconnect fabric Note that All to All and Hypercube topologies do not require external InfiniBand switches but are built by interconnecting the internal InfiniB...

Страница 49: ...he system along with additional blade enclosures You can add different types of stand alone module options to a system rack to achieve the desired system configuration You can configure and scale blade enclosures around processing capability memory size or InfiniBand fabric I O capability The blade enclosure has redundant power supplies A cooling distribution unit CDU rack expands an ICE XA rack s...

Страница 50: ...All compute blades Admin controller All Rack Leader Controllers Runs IPMI software Compute Blades Contains the following Processors Memory Optional PCIe slots and drives Optional MIC GPU cards Each Blade has a BMC Runs Linux OS Service Nodes Login Batch Gateway Optional Lustre Nodes Storage Runs Linux OS Each node has a BMC In Band Software Figure 3 3 SGI ICE XA System and Network Components Overv...

Страница 51: ... blade stand alone 1U server The rack leader controllers are guided and monitored by the system administration server Each RLC in turn monitors pulls and stores data from all the blade enclosures within the logical rack that it monitors The rack leader then consolidates and forwards data requests received from the blade enclosures to the administration server A rack leader controller also supplies...

Страница 52: ...ng distribution unit Figure 3 4 Administration and RLC Cabling to Chassis Managers The RLC as Fabric Manager In some SGI ICE XA configurations the fabric management function is handled by the rack leader controller RLC node The RLC is an independent server that is not part of the blade enclosure pair See the Rack Leader Controller on page 33 subsection for more detail The fabric management softwar...

Страница 53: ...a 1U Service Node Login Server Function The login server function within the ICE XA system can be functionally combined with the I O gateway server node function in some configurations One or more per system are supported Very large systems with high levels of user logins may use multiple dedicated login server nodes The login node functionality is generally used to create and compile programs and...

Страница 54: ... logins increase Users login to a batch server in order to run batch scheduler portable batch system load sharing facility PBS LSF programs Users login or connect to this node to submit these jobs to the system compute nodes I O Gateway Node The I O gateway server function may be combined with login or other service nodes for many configurations If required the I O gateway server function can be h...

Страница 55: ...read write and modify data in the format imposed by these file systems When a client accesses a file it completes a filename lookup on the MDS node As a result a file is created on behalf of the client or the layout of an existing file is returned to the client For read or write operations the client then interprets the layout in the logical object volume LOV layer which maps the offset and size t...

Страница 56: ...viceability RAS The SGI ICE XA server series components have the following features to increase the reliability availability and serviceability RAS of the systems Power and cooling Power supplies within the blade enclosure are redundant and can be hot swapped under most circumstances A rack level water chilled cooling option is available for D racks Blade enclosures have overcurrent protection at ...

Страница 57: ...d Optional SGI Remote Services SGI RS The optional SGI RS system automatically detects system conditions that indicate potential future problems and then notifies the appropriate personnel This enables you and SGI global support teams to pro actively support systems and resolve issues before they develop into actual failures SGI Remote Services provides a secure connection to SGI Customer Support ...

Страница 58: ...Remote Service Operations Overview An SGI Support Services Software Agent runs on each SGI system at your location enabling remote system monitoring and secure communication to SGI Support staff Your basic hardware and software configuration as well as system health information is captured and stored in the Cloud Figure 3 7 shows an example visual overview of the monitoring and response process Cl...

Страница 59: ...ions to problems and answers to questions that can be searched by sophisticated knowledge management tools You can log on to SGI Knowledgebase at any time to describe a problem or ask a question Knowledgebase searches thousands of possible causes problem descriptions fixes and how to instructions for the solutions that best match your description or question ...

Страница 60: ...ct Additional electronic services may become available after publication of this document To purchase a support contract that allows you to use all available SGI Electronic Support services contact your SGI sales representative For more information about the various support contracts see the following Web pages http www sgi com support http www sgi com services support ...

Страница 61: ...enclosure employs front mounted power supplies Compute blade Holds up to four nodes and up to 24 memory DIMMs depending on blade type 1U RLC rack leader controller One 1U rack leader server is required for each eight CMCs in a system High availability configurations using redundant RLCs are supported 1U Administrative server This server node supports an optional console and administrative software...

Страница 62: ...r RLC as well as the compute blades that reside in that rack Note that an air cooled D rack is used to support administrative and rack leader server nodes service specific nodes optional mass storage enclosures and potentially other options Optional System Components Availability of optional components for the SGI ICE XA series of systems may vary based on new product introductions or end of life ...

Страница 63: ...l Specifications on page 49 SGI ICE XA E Cell Rack Assemblies on page 50 E Cell Functional Overview on page 51 Overview At the time this document was published only specific SGI ICE XA racks were approved for ICE XA systems shipped from the SGI factory See Figure 4 4 on page 54 for an example Contact your SGI sales or support representative for more information on configuring SGI ICE XA systems in...

Страница 64: ...r doors in a system You cannot use the rear door key to secure the front door lock Cable entry exit area Cable access openings are located in the front floor and top of the rack Stand alone administrative leader and login server modules have cables that attach at the rear of the rack Rear cable connections will also be required for optional storage modules installed in the same rack with the servi...

Страница 65: ...SGI ICE XA Series D Rack 42U 007 6399 002 47 Figure 4 1 D Rack Front Lock Example ...

Страница 66: ...48 007 6399 002 4 Rack Information Figure 4 2 Optional Water Chilled Door Panels on Rear of ICE XA D Rack ...

Страница 67: ... 062 lbs 1 136 kg approximate water cooled Shipping weight max 2 365 lbs 1 075 kg approximate air cooled 2 553 lbs 1 205 kg approximate water cooled Voltage range Nominal Tolerance range North America International 200 240 VAC 230 VAC 180 264 VAC Frequency Nominal Tolerance range North America International 60 Hz 50 Hz 47 63 Hz Phase required 3 phase or optional single phase I O rack Power require...

Страница 68: ...igure 4 3 for an example The racks are connected together to create a sealed unit to support closed loop cooling The E Cell rack system does not exhaust heated air into the surrounding environment this means an E Cell does not add to the heat load of the computer room Multiple E Cells can be interconnected and configured to create very large systems Many E Cell configurations also require the use ...

Страница 69: ...e left and right side compute racks are internally different because of air flow requirements Table 4 2 SGI ICE XA E Rack Technical Specifications Characteristic Specification Operating height width depth with skins and trim installed 93 in 236 2 cm x 23 6 in 60 cm x 60 in 152 4 cm Shipping height width depth pallet and crate 89 5 in 228 cm x 38 6 in 98 cm x 63 in 160 cm Empty compute rack weight ...

Страница 70: ...aracteristic Specification Cooling rack height 93 in 236 2 cm E Cell cooling rack width 23 6 in 60 cm E Cell cooling rack depth 60 in 152 4 cm Shipping height width depth 89 5 in 228 cm x 38 6 in 98 cm x 63 in 160 cm pallet crate Cooling rack weight unit Shipping weight max Approx 1 400 lbs 635 kg Approx 1 816 lbs 825 5 kg Voltage range Nominal Tolerance range North America Japan International 480...

Страница 71: ...e cooling modules at a temperature above the room s dew point All functions such as switching pumps if applicable controlling water temperature etc are automatic Table 4 4 SGI ICE XA Cooling Distribution Unit CDU Specifications Characteristic Specification CDU height 74 2 in 188 5 cm CDU width 23 6 in 60 cm CDU depth 39 4 in 100 cm Shipping height width depth 82 in 208 3 cm x 29 3 in 74 5 cm x 45 ...

Страница 72: ...54 007 6399 002 4 Rack Information Figure 4 4 E Cell Rack Assembly Example CDU on Left ...

Страница 73: ...ibe the stand alone servers that act as management infrastructure controllers The specialized functions these servers perform within the SGI ICE XA system primarily include Administration and management Rack leader controller RLC functions Other servers described in this chapter can be configured to provide additional services such as Fabric management usually used with larger systems Login Batch ...

Страница 74: ... controller server also known as the system admin controller is at the top of the distributed management infrastructure within the SGI ICE XA system The overall SGI ICE XA series management is hierarchical see the following subsection System Hierarchy and also Figure 5 1 on page 58 with the RLC s communicating with the compute nodes via CMC interconnect System Hierarchy The SGI ICE XA system has a...

Страница 75: ...cal rack as the RLC Chassis Management Controllers The CMCs within a logical rack communicate with the following The rack leader controllers RLCs within the same logical rack The following two components communicate with CMCs in E Cell rack systems The cooling rack controller CRC is assigned to the same logical rack as the CMCs The cooling distribution unit CDU is assigned to the same logical rack...

Страница 76: ...bution Unit CDU Customer LAN 48 port GigE Switch System Control GigE Backbone V L A N 1 a n d V L A N 4 Each CMC talks to a maximum of 40 BMCs V L A N 3 V L A N 3 VLAN3 and VLAN4 Service Nodes V L A N 1 System Admin Node V L A N 1 a n d V L A N 3 Mid plane Board Management Controllers BMC Board Management Controllers BMC Up to 4 BMCs per blade Switch blade BMCs up to 4 58 007 6399 002 5 SGI ICE XA...

Страница 77: ...vision and manage cluster functions using SGI cluster management software Refer to the SGI Management Center Administration Guide for Clusters P N 007 6358 00x if you need more detailed information The RLC can query the CMCs for monitored environmental data temperatures fan speeds and voltages for each blade enclosure Power control for each blade within an enclosure is handled by the Baseboard Man...

Страница 78: ...s a dual processor serverboard based on the Intel C610 chipset The serverboard motherboard supports two Intel Xeon E5 2600 v3 series processors Four DDR4 memory channels are available per CPU socket with two DIMM slots per channel A direct media interface connects the node s PCH ASIC to processor 1 while 40 lane Gen 3 PCIe interconnect lines link both processors directly to the motherboard LAN por...

Страница 79: ...file expansion slot 1U Service Nodes 007 6399 002 61 Figure 5 4 SGI Rackable C1104 GP1 1U Service Node Front and Rear Panel Example 2 1 Figure 5 5 SGI Rackable C1104 GP1 System Control Panel and LEDs From left to right the LED indicators are Overheat fan fail UID LAN1 and LAN2 network indicators Hard drive activity and power good LEDs ...

Страница 80: ...vers are 2U rackmount service nodes Each model of the server has two main subsystems the 2U server chassis and a dual processor serverboard The C2112 GP2 system offered uses up to twelve hard disk drives Figure 5 6 shows a front and rear view example of the C2112 GP2 service node s components See the SGI Rackable C2112 GP2 System User Guide P N 007 6362 00x for more detailed information on these 2...

Страница 81: ...rear view of the SGI UV 30 service node and describes the unit s external components HDD 0 HDD 1 HDD 2 HDD 3 HDD 4 HDD 5 HDD 6 HDD 7 HDD 8 HDD 9 HDD 10 HDD 11 HDD 12 HDD 13 HDD 14 HDD 15 HDD 16 HDD 17 HDD 18 HDD 19 HDD 20 NVMe HDD 21 NVMe HDD 22 NVMe HDD 23 NVMe Control panel Hard drive bays 24 Power supplies 2 PCI expansion slots with riser cards UID switch LED USB Ports VGA Port IPMI LAN Port LA...

Страница 82: ......

Страница 83: ...0 System level Specifications Table A 1 summarizes the SGI ICE XA series configuration ranges Table A 1 SGI ICE XA Series Configuration Ranges Category Minimum Maximum Blades per enclosure 2 bladesa a Compute blades support four stuffed sockets each 9 blades Blades per E Cell 18 blades 72 Compute nodes per blade 4 compute nodes 4 compute nodes Blade enclosure 1 per rack 4 per rack Compute blade DI...

Страница 84: ...ll maximum 2 062 lbs 1 136 kg approximate water cooled Shipping weight maximum 2 553 lbs 1 205 kg approximate water cooled Shipping height maximum 88 75 in 225 4 cm Shipping width 44 in 111 8 cm Shipping depth 62 75 in 159 4 cm Voltage range Nominal Tolerance range North America International 200 240 VAC 230 VAC 180 264 VAC 180 254 VAC Frequency Nominal Tolerance range North America International ...

Страница 85: ...ating no condensation Rack cooling requirements Ambient air or optional water cooling Heat dissipation to air Air cooled ICE XA rack Approximately 115 63 kBTU hr maximum based on 33 89 kW 100 dissipation to air Heat dissipation to air Water cooled ICE XA rack Approximately 5 76 kBTU hr maximum based on 33 89 kW 5 dissipation to air Heat dissipation to water Approximately 109 85 kBTU hr maximum bas...

Страница 86: ...ght full 2 500 lbs 1 134 kg approximate Shipping weight max 2 908 lbs 1 319 kg approximate Voltage range Nominal Tolerance range North America International 200 240 VAC 230 VAC 180 264 VAC 180 254 VAC Frequency Nominal Tolerance range North America International 60 Hz 50 Hz 47 63 Hz 47 63 Phase required single phase or optional 3 phase Power requirements max 76 kVA 77 47 kW Hold time 20 ms Power c...

Страница 87: ...0 C 40 F to 60 C 140 F Relative humidity 10 to 95 operating no condensation 10 to 95 non operating no condensation Rack cooling requirements Chilled water cooling Heat rejection dissipation to air Zero BTUs Heat rejection dissipation to water Approximately 246 kBTU hr maximum 21 tons based on 100 dissipation to water Maximum altitude 10 000 ft 3 049 m operating 40 000 ft 12 195 m non operating E C...

Страница 88: ... A 1 Ethernet Port Table A 6 shows the cable pinout assignments for the Ethernet port operating in 10 100 Base T mode and also operating in 1000Base T mode Table A 6 Ethernet Pinouts Ethernet 10 100Base T Pinouts Gigabit Ethernet Pinouts Pins Assignment Pins Assignment 1 Transmit 1 Transmit Receive 0 2 Transmit 2 Transmit Receive 0 3 Receive 3 Transmit Receive 1 4 NU 4 Transmit Receive 2 5 NU 5 Tr...

Страница 89: ...may fall causing serious damage to the product 5 Slots and openings in the system are provided for ventilation To ensure reliable operation of the product and to protect it from overheating these openings must not be blocked or covered This product should never be placed near or over a radiator or heat register or in a built in installation unless proper ventilation is provided 6 This product shou...

Страница 90: ...per adjustment of other controls may result in damage and will often require extensive work by a qualified technician to restore the product to normal condition If the product has been dropped or the cabinet has been damaged If the product exhibits a distinct change in performance indicating a need for service 11 If a lithium battery is a soldered part only qualified SGI service personnel should r...

Страница 91: ...opean requirements Caution This product has several governmental and third party approvals licenses and permits Do not modify this product in any way that is not expressly approved by SGI If you do you may lose these approvals and your governmental agency authority to operate this device CMN Number The model number or CMN number for the system is on the system label which is mounted inside the rea...

Страница 92: ...o communications Operation of this equipment in a residential area is likely to cause harmful interference in which case you will be required to correct the interference at your own expense If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on you are encouraged to try to correct the interference by using one ...

Страница 93: ... numériques de Classe A préscrites dans le Règlement sur les interferences radioélectriques établi par le Ministère des Communications du Canada VCCI Notice Japan Only Figure B 1 VCCI Notice Japan Only Chinese Class A Regulatory Notice Figure B 2 Chinese Class A Regulatory Notice Korean Class A Regulatory Notice Figure B 3 Korean Class A Regulatory Notice ...

Страница 94: ...trostatic discharge ESD ESD is a source of electromagnetic interference and can cause problems ranging from data errors and lockups to permanent component damage It is important that you keep all the covers and doors including the plastics in place while you are operating the system The shielded cables that came with the unit and its peripherals should be installed correctly with all thumbscrews f...

Страница 95: ...n Warning Advarsel Laserstråling nar deksel åpnesstirr ikke inn i strålen Lithium Battery Statements Warning If a lithium battery is a soldered part only qualified SGI service personnel should replace this lithium battery For other types replace the battery only with the same type or an equivalent type recommended by the battery manufacturer or the battery could explode Discard used batteries acco...

Страница 96: ...amma batterityp eller en ekvivalent typ som rekommenderas av apparattillverkaren Kassera anvãnt batteri enligt fabrikantens instruktion Warning Varoitus Päristo voi räjähtää jos se on virheellisesti asennettu Vaihda paristo ainoastaan laitevalmistajan suosittelemaan tyyppiin Hävitä käytetty paristo valmistajan ohjeiden mukaisesti Warning Vorsicht Explosionsgefahr bei unsachgemäßen Austausch der Ba...

Отзывы: