
Connecting the Monitor Cables to the DCD (Silicon Graphics Fuel Workstation)
007-4209-003
99
Figure 3-5
Connecting the Monitor Signal Cables to the DCD in a Silicon Graphics Fuel
Workstation
Copy
right
2001
Silic
on G
raph
ics, In
c.
This
devic
e com
plie
s with
FCC
Part
15, C
anad
a D
OC,
Japa
n VC
CI a
nd E
urop
ean ra
dio fr
eque
ncy e
miss
ions
requ
irem
ents
. R
efer
to u
ser m
anua
l for fu
ll in
form
atio
n.
Silico
n Gra
phic
s, In
c. 16
00 A
mph
ithea
tre P
arkw
ay
Mou
ntain
View
, CA
94
043-1
351
024-X
XXX
-001
mad
e in th
e US
A
Mod
el N
o.: C
MN 0
15
CISP
R 22
Clas
s A
VCC
I
Clas
s A
NRT
L/C
LR96
309
ACN
006
7707
89
All rig
hts re
serve
d
2
1
To left monitor
To right monitor
Содержание Fuel
Страница 4: ......
Страница 6: ......
Страница 13: ...007 4209 003 xiii Tables Table 5 1 DCD Troubleshooting Tips 114 Table 5 2 DCD Pinout Assignment 116 ...
Страница 14: ......
Страница 18: ......
Страница 44: ...26 007 4209 003 1 Installing the DCD in a Single Head Octane2 Figure 1 22 Inserting the XIO Tri Module ...
Страница 71: ...Connecting the DCD 007 4209 003 53 Figure 2 18 Installing the Nylon Standoff Screw A Standoff B C ...
Страница 120: ......
Страница 130: ......
Страница 140: ......