1: SGI Altix XE1300 Cluster Quick-reference
Power Down the Cluster
Note:
You can also use the baseboard management controller (BMC) interface to perform power
management and other administrative functions. Refer to the
Altix XE310 User’s Guide
,
publication number 007-4960-00
x
, for more information about the BMC interface. See the
SGI
Altix XE320 User’s Guide
, publication number 007-5466-00
x
for information on its BMC.
You can use the Scali parallel shells tools suite to perform remote power management from the
head node. Login to the head node as root, and use the
/opt/scali/sbin/power
command
to manage the system.
#
power -H
Usage:
/opt/scali/sbin/power
[
option
] [
nodelist
<on|off|cycle|status>]
Example:
Use the following command to power cycle cluster nodes 001 through 032:
power cl1n[001-032] -cycle
If your cluster uses the Scali Manage administrative software (release 5.x.x), you can power-off
specific nodes or the entire system using the graphical user interface. Select
Management
Menu>Power Mgt>Power Off
. The compute nodes can be halted from the Scali GUI by
selecting the nodes and choosing “halt system” and “power down” from the System Management
menu. A command line interface is also available to power-on/off or check status.
Note:
Refer to the
Scali Manage User’s Guide
for more information. You must have root
privileges to perform these types of tasks.