10 Copyright ©Sigicom AB 2003-2015
3.2
Mounting
Please use the included hardware for pole mounting. Try to site the
monitors as near the point of public exposure as possible. For model
validation, it is important to cover a range of urban background and
roadside sites, if possible.
3.3
Start-up instruction
1.
Connect your X20DM2 with one INFRA Datalogger (Master,
Mini or Micro) by using any of the available INFRA Sensor
Cables.
2.
Connect X20DM2 to the external power. Osiris will then start
automatically.
Note! If you want to run without external power, you need to
manually start the Osiris by pressing its “ON - Reset” key. The
instrument can be run without external power for at least eight
hours when Osiris is fully charged.
3.
Start the Datalogger and wait for the initialization process to be
finished.
4.
Make necessary adjustments of the parameters:
• Standard (S01 or S02)
• Interval time
• Upper threshold level (on/off, and value if on is selected)
• Customer string
via Remote Control in the PC-application INFRA Net Manager,
or directly by using the Master display and buttons.
Note! Each standard has its own parameters (Interval time,
Upper threshold level, and Customer string).
5.
Activate REG ON, and the measurement will be initiated.
Содержание INFRA X20DM2
Страница 2: ......
Страница 21: ...Copyright Sigicom AB 2003 2015 19 A 4 Air flow Flow rate 600 cm3 min...