Appendix
A.3 Installation and maintenance schedule
VersiCharge AC Wallbox IEC
68
Operating Instructions, 03/2021, A5E50366109-AA
VersiCharge checklist
The following table shows the tasks and their expected duration for the following
applications:
•
Installation/assembly
•
Commissioning
•
Maintenance
Table A- 1
Installation and maintenance schedule
Action
Installa-
tion/asse
mbly
Commis-
sioning
Mainte-
nance
Duration
in min.
Mark and drill holes
x
5
Mount the charging unit
x
10
Assemble and connect the connection cable
x
15
Visual and functional check for mechanical damage
•
Type 2 plug or lid
•
Housing
x
x
1
Commissioning with the mobile app / PC tool
x
10
Check
•
Fault message
•
Backend connection (e.g. Siemens Device Management)
•
SIM card
x
x
5
Cleaning
x
5
Check charging sockets or charging cables
•
Charging cable and plug for damage
x
2
Measurements acc. to DIN VDE, e.g.:
•
Insulation measurement
•
Grounding resistance measurement
•
Loop impedance measurement
x
x
25*
Generate maintenance log
x
x
15*
Function test
•
Trial charge (with commercial or electric vehicle)
x
x
x
10*
Setup time
x
x
10*
Indication of the next test date
x
x
2
Read out meter readings
x
x
2
Travel time
x
x
x
*Scope and duration may vary as they depend on local regulations.
Содержание VersiCharge
Страница 1: ......