2.2 Stud Mounting – Recommended (Use center-top and bottom holes)
Figure 1. Align mounting bracket and screw into the stud
NOTE:
For installation, the mounting-bracket hinges will be pointing to the ceiling, and the flat side of the
bracket will be against the wall.
1. Locate a stud within the wall that can handle the 17+ lb. load of the VersiCharge.
2. Place the mounting bracket not more than 12” above a 240 V outlet; level the mounting bracket and drill the
center-top hole using a drill with an extender.
3. Mount the bracket using the top hole and the lag screws, DO NOT tighten all the way.
4. Level the bracket
5. Drill a pilot hole for the center-bottom hole.
6. Secure with lag screws.
7. Tighten top and bottom screws securely using an Allen wrench.
• For concrete cinder block walls, install appropriate anchors. If using an existing outlet, ensure that power cord
will reach to the outlet. Using a 7/16” socket, attach mounting bracket to the wall in compliance with all National
Electrical Code® (NEC) and local jurisdiction requirements, using the 2 lag screws provided.
• For Siemens Post installation, see the post instruction manual at: (usa.siemens.com/versicharge)
12
VersiCharge™ AC Electric vehicle charging station