6 – 4
6.2
Charge the closing spring
Charging manually
F
Handle force
n
Number of strokes
(1)
Spring charged
WARNING
Heavy equipment
May result in serious injury and/or property damage.
Secure the circuit breaker before charging it manually (e.g. during service on the work bench).
NOTE
To charge the spring mechanism, grip the handle firmly and carry out each stroke evenly, moving the lever down as far as it will go.
Despite a significant increase in the required actuating force, the lever must be moved as far in the ninth stroke as in the first eight.
When the closing spring is fully charged, the lever can be moved without resistance.
9 x
1
2
3
4
5
6
7
8
9
10
n
F
0727
(1)
Содержание UL 1066
Страница 43: ...6 12 7 Reset reclosing lockout 8 Charge closing spring 9 Switch ON Frame size II Frame size III 9X ...
Страница 56: ...7 5 7 2 Frame size II fused ...
Страница 58: ...7 7 ...
Страница 63: ...7 12 8 27 210 0 8 27 210 0 8 27 210 0 3 75 95 2 ...
Страница 64: ...7 13 ...
Страница 65: ...7 14 7 7 Frame size III fuse carriage ...
Страница 66: ...7 15 ...
Страница 69: ...7 18 7 9 External sensor for neutral conductor WLNCT2 ...
Страница 70: ...7 19 WLNCT3 ...
Страница 85: ...9 5 I tripping Ground fault tripping ...
Страница 231: ...15 12 Pre assembling the locking module Installing 0767 1 2 3 4 6 5 ...
Страница 232: ...15 13 1 Socket head cap screw M5 with washer and nut 7 8 Size 4 5 Nm 45 lb in ...
Страница 271: ...19 10 Function check Then Fit back front panel and side cover on the right if it was removed page 23 4 10 ...
Страница 280: ...21 2 Installing the door sealing frame Not for use with fuse carriages Catalog No Door sealing frame WLDSF 1 2 3 NOTICE ...
Страница 289: ...23 7 23 3 3 Installing arc chutes 1 2 6 5 PH 2 0043 02 3 4 5 6 For frame size III 3 PH 2 ...
Страница 298: ...23 16 6 7 8 9 5 2 1 Size 5 mm ...
Страница 333: ......