Installing the On Street Equipment
Following the installation of Stool, Controller Cabinet, Signal Poles and Cabling, the next
installation activity is likely to be the remainder of the on-street equipment.
There are number of handbooks that cover these topics in detail;
667/HE/20662/000 Installation & Commissioning
–
Signals & Poles
667/HB/30000/000 Helios General Handbook
667/HB/31900/000 Heimdall Above Ground Detector Manual
In addition, Section 4 covers all the Plus+ specific equipment and the details with regards to
interconnections.
If the equipment has not been pre-scanned, using the Installation App to allocate the serial
numbers of the Nodes to the configuration file, then this is also a suitable point for this to occur.
The Plus
+
Installation App Quick Start Guide (667/HQ/53000/300) provides details.
Confirmation of the Layout Design and Configuration
The Plus
+
Design Layout will have a drawing number and revision. It is prudent to check the
Plus+ Design Layout Configuration matches the Design Layout Drawing.
When using the Installation Application, the home screen will display the Drawing Number,
Drawing Title and Revision. Further details can be found in Plus
+
Installation App Quick Start
Guide 667/HQ/53000/300
Controller Commissioning
In order to successfully commission a ST950 Plus
+
controller, the use of a laptop and the USB
handset port is highly recommended. Many of the traditional handset commands are supported
but the user will find that the web interface provides a more detailed and appropriate view of the
controller status to allow easier testing and commissioning.
FAT (Factory Acceptance Testing)
It is normally expected that the site design (Plus
+
layout configuration, site drawing and IC4
Configuration) is reviewed with the customer.
Refer to MM-TS-CS-FM-026 which provides full details and a checklist. The commissioning
processes detailed below assume the customer FAT has been completed.