![Siemens SITRANS LG240 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/siemens/sitrans-lg240/sitrans-lg240_operating-instructions-manual_374496020.webp)
20
PBD-51041038
SITRANS LG240 - Operating Instructions
44286-EN-171021
5 Connecting to power supply
5.1 Preparing the connection
Always keep in mind the following safety instructions:
Warning:
Connect only in the complete absence of line voltage.
•
The electrical connection must only be carried out by trained
personnel authorised by the plant operator.
•
If overvoltage surges are expected, overvoltage arresters should
be installed.
Power supply and current signal are carried on the same two-wire
cable. The operating voltage can differ depending on the instrument
version.
The data for power supply are specified in chapter "
Technical data
".
Keep in mind the following additional factors that influence the operat-
ing voltage:
•
Lower output voltage of the power supply unit under nominal load
(e.g. with a sensor current of 20.5 mA or 22 mA in case of fault)
•
Influence of additional instruments in the circuit (see load values in
chapter "
Technical data
")
The instrument is connected with standard two-wire cable without
screen. If electromagnetic interference is expected which is above the
test values of EN 61326-1 for industrial areas, screened cable should
be used.
Make sure that the cable used has the required temperature resist-
ance and fire safety for max. occurring ambient temperature
We generally recommend the use of screened cable for HART
multidrop mode.
Use cable with round cross section for instruments with housing and
cable gland. Use a cable gland suitable for the cable diameter to
ensure the seal effect of the cable gland (IP protection rating).
Metric threads
In the case of instrument housings with metric thread, the cable
glands are screwed in at the factory. They are sealed with plastic
plugs as transport protection.
You have to remove these plugs before electrical connection.
NPT thread
In the case of instrument housings with self-sealing NPT threads, it is
not possible to have the cable entries screwed in at the factory. The
free openings for the cable glands are therefore covered with red dust
protection caps as transport protection.
Prior to setup you have to replace these protective caps with ap-
proved cable glands or close the openings with suitable blind plugs.
Safety instructions
Voltage supply
Connection cable
Cable glands
Содержание SITRANS LG240
Страница 2: ...2 PBD 51041038 SITRANS LG240 Operating Instructions 44286 EN 171021 ...
Страница 85: ...Notes 85 PBD 51041038 SITRANS LG240 Operating Instructions 44286 EN 171021 ...
Страница 86: ...Notes 86 PBD 51041038 SITRANS LG240 Operating Instructions 44286 EN 171021 ...
Страница 87: ...Notes 87 PBD 51041038 SITRANS LG240 Operating Instructions 44286 EN 171021 ...