
B.2
Enabling insulation test
The insulation test must be carried out on the advance version of the MAG 8000 or MAG 8000
CT before generating the Qualification Certificate. The procedures for enabling the insulation
test are shown below.
Set "Insulation test enable" to "Yes" if not already enabled.
Select “Device” → “Download to Device …” to download the change to the device.
Qualification certificate
B.2 Enabling insulation test
SITRANS MAG 8000
130
Operating Instructions, 11/2018, A5E03071515-AE
Содержание SITRANS F M MAG 8000
Страница 10: ...Introduction 1 3 Further Information SITRANS MAG 8000 10 Operating Instructions 11 2018 A5E03071515 AE ...
Страница 16: ...Description 3 4 Benefits SITRANS MAG 8000 16 Operating Instructions 11 2018 A5E03071515 AE ...
Страница 56: ...Commissioning 6 6 Data protection SITRANS MAG 8000 56 Operating Instructions 11 2018 A5E03071515 AE ...
Страница 74: ...Operation 7 6 Battery powered operation SITRANS MAG 8000 74 Operating Instructions 11 2018 A5E03071515 AE ...
Страница 90: ...Troubleshooting FAQs 9 3 Flow simulation SITRANS MAG 8000 90 Operating Instructions 11 2018 A5E03071515 AE ...
Страница 164: ...Index SITRANS MAG 8000 164 Operating Instructions 11 2018 A5E03071515 AE ...