Power-On and Power-Up
5.2 First power-up
Manual
124
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
5.2
First power-up
5.2.1
Basic commissioning of the system software
Objective of basic commissioning
After the basic commissioning described in the following two sections, the following
conditions should apply:
●
SINUMERIK 840Di sl NC and PLC are operated in cyclical operation
●
If a machine control panel is connected, no alarms or messages should be pending.
●
The displayed axes of the NC can be traversed by simulation.
Factory settings
The hard disk of the PCU is already partitioned upon delivery for operating the SINUMERIK
840Di sl. Additional software applications, which have been been ordered, e.g. HMI
Advanced, are ready for installation under:
●
D:\Setup\Apps\<
Application1> . . . <Application n>
1DPH(0(5*(1&<
&RQWHQW:LQ3(
1DPH6<67(0
&RQWHQW:LQGRZV;3
1DPH703
&RQWHQW,PDJHV
6HWXSV8SGDWHV
1DPH86(5
&RQWHQW'LVO
([WHQGHGSDUWLWLRQZLWKORJLFGULYHV
3ULPDU\SDUWLWLRQ
&
17)6
'
17)6
(
17)6
)
17)6
Figure 5-1
Partitioning the hard disk
Installing the software
When the PCU is first booted, the following menu is displayed:
Содержание SINUMERIK 840Di sl
Страница 118: ...Configuration 3 3 Connection overview Manual 118 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 148: ...Power On and Power Up 5 7 License management Manual 148 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 186: ...PLC commissioning 6 8 Load configuration in PG PLC STEP 7 Manual 186 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 344: ...Drive commissioning SINAMICS 9 5 Basic principles Manual 344 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 624: ...Glossary Manual 624 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...