![Siemens Sinamics SM150 6SL3845-2NN41-8AD0 Скачать руководство пользователя страница 154](http://html.mh-extra.com/html/siemens/sinamics-sm150-6sl3845-2nn41-8ad0/sinamics-sm150-6sl3845-2nn41-8ad0_operating-and-installation-instructions_378235154.webp)
Required tools
● A suitable, flat cooling water catchment tray with a capacity of at least seven liters for
draining the drive
● Open-ended spanner (16 mm, 18 mm, 22 mm)
● Socket spanner set
Removing a phase module
Prepare the changing deviceas described in Section "Attaching the changing device to the
Preparation
1. Remove the electrical connections from the lifting solenoids
③
.
2. Loosen the screws connecting the central brace with the frame of the cabinet, and remove
the central brace.
Figure 9-14
Lifting solenoid
Maintenance
9.5 Repair
SINAMICS SM150 6SL3845-2NN41-8AD0
154
Operating Instructions Rev.201908010908 EXAMPLE
Содержание Sinamics SM150 6SL3845-2NN41-8AD0
Страница 2: ...01 08 2019 09 08 V32 00 ...
Страница 98: ...Start up SINAMICS SM150 6SL3845 2NN41 8AD0 98 Operating Instructions Rev 201908010908 EXAMPLE ...
Страница 172: ...Spare parts SINAMICS SM150 6SL3845 2NN41 8AD0 172 Operating Instructions Rev 201908010908 EXAMPLE ...
Страница 176: ...Service Support SINAMICS SM150 6SL3845 2NN41 8AD0 176 Operating Instructions Rev 201908010908 EXAMPLE ...
Страница 187: ......
Страница 190: ......
Страница 192: ......