9.2
Grounding the system
WARNING
Danger due to high voltage after shutdown
High voltages can still be present even after shutdown. Touching the device can result in death
or serious injury.
● Only work on the power unit if it has been sufficiently grounded. Before touching the device,
carefully ensure that the following parts of the power unit are de-energized and are in a no-
voltage condition:
– Internal busbars
– Input and output terminals
– Auxiliary power supply
● Always observe the five safety rules (Page 11) when carrying out any work on the device.
Use a three-pole grounding harness for fixed ball points to ground the system. When ordering
a grounding harness, contact Service & Support.
Use a sufficient number of grounding harnesses corresponding to the configuration. A
grounding harness is required for each three-phase system.
9.3
Preventive maintenance
The purpose of an inspection is to ascertain and evaluate the current status of the equipment.
An inspection mainly comprises visual checks. Inspections should be carried out based on a
schedule that meets the needs of the special ambient conditions at the location of use. The
following servicing and inspection instructions are used as the basis for regular inspection of
the equipment.
Maintenance work
Carried out by
Frequency
Comments
Check the cooling system
Operating com‐
pany
After one year
See the specifications in
the Operating Instructions
Clean the outside of the cab‐
inet
Operating com‐
pany
As required
Visual inspection, clean if
required
Clean the inside of the cabi‐
net
Siemens serv‐
ice personnel
Annually
Visual inspection, clean if
required
Check power and control
connections
Operating com‐
pany
After one year, and every
four years thereafter
Check internal connections
Siemens serv‐
ice personnel
After one year, and every
four years thereafter
Carry out an inspection and
visual check
Siemens serv‐
ice personnel
Annually
Check spare parts
Siemens serv‐
ice personnel
Annually
Maintenance
9.3 Preventive maintenance
SINAMICS SL150 6SL38655UM427AA02
Operating Instructions Rev.201910281507 EXAMPLE
67
Содержание SINAMICS SL150 6SL38655UM427AA02
Страница 2: ...28 10 2019 15 07 V18 00 ...
Страница 50: ...Mounting 5 2 Torques SINAMICS SL150 6SL38655UM427AA02 50 Operating Instructions Rev 201910281507 EXAMPLE ...
Страница 60: ...Commissioning SINAMICS SL150 6SL38655UM427AA02 60 Operating Instructions Rev 201910281507 EXAMPLE ...
Страница 86: ...Maintenance 9 6 Repairs SINAMICS SL150 6SL38655UM427AA02 86 Operating Instructions Rev 201910281507 EXAMPLE ...
Страница 88: ...Spare parts SINAMICS SL150 6SL38655UM427AA02 88 Operating Instructions Rev 201910281507 EXAMPLE ...
Страница 99: ......
Страница 102: ......
Страница 104: ......