
$
%
&
Figure 9-6
Removing the current transformer
Installing the current transformer
To install the current transformer, proceed as follows:
1. Carry out the removal steps in reverse order.
2. Screw the screws into the busbars with a tightening torque of 25 Nm.
3. After installing the current transformer, check that it works properly.
9.6.6
Replacing the thyristor electronics and thyristors
9.6.6.1
Check components of the thyristor assembly
In the event of a thyristor assembly failing, establish which component has failed:
• Thyristor (by resistance measurement)
When a thyristor fault message is output, the fault value indicates which thyristor is
affected. Check the thyristor resistance while it is installed.
• Thyristor electronics (by replacement)
Send the replaced thyristor electronic boards to the manufacturer for testing.
• Fiber-optic cables
Replace the fiber-optic cables according to the instructions for laying fiber-optic cables.
Maintenance
9.6 Repairs
3rd Party LCI Control Upgrade
Operating Instructions, 02/2022, A5E31872818
127
Содержание SINAMICS MV 9LD4110-7EX70-1AA0
Страница 2: ......
Страница 60: ...Description 3 5 Options 3rd Party LCI Control Upgrade 58 Operating Instructions 02 2022 A5E31872818 ...
Страница 114: ...Operation 8 5 Fault and system messages 3rd Party LCI Control Upgrade 112 Operating Instructions 02 2022 A5E31872818 ...
Страница 140: ...Spare parts 3rd Party LCI Control Upgrade 138 Operating Instructions 02 2022 A5E31872818 ...
Страница 144: ...Service Support 3rd Party LCI Control Upgrade 142 Operating Instructions 02 2022 A5E31872818 ...
Страница 153: ......