Electrical Installation
11/03
SINAMICS G150
4-20
Operating Manual
Customer terminal block
DI 0
4
3
2
1
DI 1
DI 3
DI 2
5
M1
6
M
X520
+ 24 V
4
3
2
1
+ 24 V
+ 24 V
+ 24 V
5
+ 24 V
+ 24 V
6
+ 24 V
7
8
+ 24 V
X540
AI 0+
4
3
2
1
AI 0-
AI 1-
AI 1+
5
P10
6
M
X521
7
N10
M
8
AO 0V+
4
3
2
1
AO 0-
AO 1V+
AO 0C+
5
AO 1-
6
AO 1C+
X522
7
+ Temp
- Temp
8
V
A
V
A
ϑ
+ 24 V
M
X524
+
M
+
M
M +
M
+
DI 4
4
3
2
1
DI 5
DI 7
DI 6
5
M2
6
M
X530
X542
4
3
2
1
DO 0
5
DO 1
6
V
X541
DI/DO 8
1
2
3
4
5
6
DI/DO 9
DI/DO 11
+
DI/DO 10
M
M
S5.0
+
-
S5.1
+
-
A
D
A
D
24V
5V
DI
Out/In
DO
P24V
Fig. 4-5
Connection overview for customer terminal block TM31
Содержание SINAMICS G150
Страница 1: ...Operating Manual Edition 11 2003 sinamics Converter Cabinet Units SINAMICS G150 75 kW to 800 kW ...
Страница 2: ......
Страница 22: ...Device Overview 11 03 SINAMICS G150 2 10 Operating Manual ...
Страница 136: ...Monitoring Functions and Protective Functions 11 03 SINAMICS G150 9 2 Operating Manual 9 2 Monitoring in preparation ...
Страница 196: ...Diagnosis Faults and Alarms 11 03 SINAMICS G150 10 54 Operating Manual ...
Страница 208: ...Maintenance and Servicing 11 03 SINAMICS G150 11 12 Operating Manual ...
Страница 234: ......
Страница 238: ...Parameterlist 11 03 SINAMICS G150 Parameterlist 4 Operating Manual ...
Страница 239: ......