Commissioning
5
5.1
Commissioning guidelines
Overview
7KHLQYHUWHULV
LQVWDOOHG
&RPPLVVLRQLQJLV
FRPSOHWHG
3UHSDUHIRU
FRPPLVVLRQLQJ
3HUIRUPTXLFN
FRPPLVVLRQLQJ
,VWKH
IDFWRU\VHWWLQJ
VXIILFLHQW"
'RHVWKH
LQYHUWHUKDYHWKH
IDFWRU\VHWWLQJ"
,VTXLFN
FRPPLVVLRQLQJ
VXIILFLHQW"
1R
<HV
3HUIRUPH[WHQGHG
FRPPLVVLRQLQJ
%DFNLQJXSGDWD
1R
<HV
5HVWRUHWKHIDFWRU\
VHWWLQJVIRUWKHLQYHUWHU
1RRUXQNQRZQ
<HV
1. Define the requirements to be
met by the drive for your
application.
2. Restore the factory settings of
the converter if necessary.
3. Check if the factory setting of the
converter is sufficient for your
application.
4. Set the following for quick
commissioning of the drive:
– The closed-loop motor control
– The inputs and outputs
– The fieldbus interface
5. Check if additional converter
functions are required for the
application.
6. If necessary, adapt the drive.
7. Save your settings.
SINAMICS G120XA converter
Operating Instructions, 03/2019, FW V1.0, A5E44751205B AB
103
Содержание SINAMICS G120XA
Страница 2: ......
Страница 12: ...Table of contents SINAMICS G120XA converter 10 Operating Instructions 03 2019 FW V1 0 A5E44751205B AB ...
Страница 104: ...Wiring 4 2 Control interfaces SINAMICS G120XA converter 102 Operating Instructions 03 2019 FW V1 0 A5E44751205B AB ...
Страница 916: ...Index SINAMICS G120XA converter 914 Operating Instructions 03 2019 FW V1 0 A5E44751205B AB ...
Страница 917: ......