3
F
unction
d
iag
ram
s
3.3
Inp
u
t/o
ut
pu
t te
rm
ina
ls
SINAMICS
G120D
60
6
L
ist Manual (LH
14)
, 01/2
016
, A5E3384231
3
F
ig.
3
-7
22
41 – Digi
ta
l o
utputs
(DO
0 ...
DO
1)
- 2241 -
Function diagram
8
7
6
5
4
3
2
1
fp_2241_97_04.vsd
Input/Output Terminals
SINAMICS G120D
09.12.2015
V4.7.6
Digital outputs (DO 0 … DO 1)
(52.3)
CU S_src DO 0
p0730
(52.7)
CU S_src DO 1
p0731
CU DO inv
p0748
CU DO inv
p0748
X05.4
X05.2
DO 0
DO 1
Sampling time of the DO: 2 ms
CU DO status
r0747
CU DO status
r0747
.1
.0
X05.3
Switched 0 V
X05.5
Functional Earth
1
0
24 V
0 V
1
0
24 V
0 V
1
0
1
1
0
1
Содержание SINAMICS G120D CU240D-2 DP
Страница 1: ...s SINAMICS SINAMICS G120D Control Units CU240D 2 CU250D 2 List Manual 01 2016 Edition ...
Страница 2: ......
Страница 954: ...4 Faults and alarms 4 2 List of faults and alarms SINAMICS G120D 954 List Manual LH14 01 2016 A5E33842313 ...
Страница 978: ...Index SINAMICS G120D 978 List Manual LH14 01 2016 A5E33842313 ...
Страница 979: ......