The documentation must be signed.
Who may perform the acceptance test of the inverter?
Personnel from the machine manufacturer, who, on account of their technical qualifications
and knowledge of the safety functions, are in a position to perform the acceptance test in the
correct manner are authorized to perform the acceptance testing of the inverter.
Reduced acceptance test after function expansions
A full acceptance test is necessary only after first commissioning. A reduced acceptance test
is sufficient when safety functions are expanded.
Measure
Acceptance test
Acceptance test
Documentation
Functional expansion of the ma‐
chine (additional drive).
Yes.
Only check the safety
functions of the new
drive.
● Supplement machine overview
● Supplement inverter data
● Add function table
● Log the new checksums
● Countersignature
Transfer of inverter settings to oth‐
er identical machines by means of
series commissioning.
No.
Only check the control
of all of the safety func‐
tions.
● Add machine description
● Check checksums
● Check firmware versions
Document for the acceptance
The STARTER provides you with a number of documents to be regarded as a recommendation
for the acceptance tests of the safety functions.
Advanced commissioning
6.15 Safe Torque Off (STO) safety function
SINAMICS G120C converter
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34263257B AF
233