Service and maintenance
5.1 Maintenance
Power Module PM240P-2
50
Hardware Installation Manual, 06/2020, A5E37800827C AD
5.1
Maintenance
The purpose of maintenance is to maintain the specified condition of the Power Module.
Regularly remove dirt and pollution, and replace the fan in plenty of time.
Cleaning
Clean the converter with an anti-static brush, a vacuum cleaner and areas that are difficult to
access, using dry compressed air (max. 1 bar).
Ventilation
The devices must be installed in a cabinet. Ensure that the cabinet's ventilation slots are not
blocked. Check that the fan is functioning correctly.
Cables and screw terminals
Regularly check the cables for damage, and immediately replace any defective parts.
Regularly check that the screw terminals have been correctly tightened. Retighten the
screws if necessary.
Note
The actual maintenance intervals depend on the installation and operating conditions.
Siemens offers its customers support in the form of service contracts. For further information,
contact your Siemens regional office or sales office.
Содержание SINAMICS G120 PM240P-2
Страница 1: ...Power Module PM240P 2 ...
Страница 2: ......
Страница 102: ...Appendix A 3 Abbreviations Power Module PM240P 2 100 Hardware Installation Manual 06 2020 A5E37800827C AD ...
Страница 105: ......
Страница 106: ......