Procedure for installing the frequency inverter
Prerequisites for installing the frequency inverter
Check that the following prerequisites are fulfilled before you install the frequency inverter:
●
Are the ambient conditions permissible?
●
Are the components required for installation available?
●
Are all the necessary tools and spare parts available?
●
Have the cables and wires been routed in accordance with the applicable regulations?
(Are the cables from the power and control terminals physically separated?)
●
Are the minimum distances from other equipment complied with? (Is the volume of
cooling air sufficient?)
Installation sequence
1.
Install the Power Module (for detailed instructions, see the Hardware Installation Manual
for the Power Module)
–
Remove terminal covers - where applicable
–
Connect motor cable and power cable
–
Terminate the shield over a large area, if necessary using a shield connection set
–
Refit the terminal covers
2.
Mount the Control Unit
–
Open the terminal covers of the Control Unit
–
Connect the control lines to the terminals
–
Terminate the shield over a large area, if necessary using a shield connection set
–
Close the terminal covers again
3.
Control Unit – for operation in a higher-level control – connect to the fieldbus
–
For PROFIBUS DP and CANopen connect it via the 9-pin sub D connector
–
For RS 485, connect it via the two-part bus connector
4.
To commission the drive unit, either plug-in the operator control/display instrument
(Operator Panel) or connect the frequency inverter to the PC using the PC-frequency
inverter connection kit.
Installation has now been completed and you can begin commissioning.