
Commissioning
4.4 Commissioning with the BOP-2
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA
69
4.4.3
Menu structure
2.
(6&
2.
(6&
2.
(6&
2.
(6&
2.
(6&
2.
(6&
2.
(6&
(;75$6
6(783
3$5$06
',$*126
&21752/
021,725
)520&5'
72%23
)520%23
72&5'
'595(6(7
),/7(5
(;3(57
),/7(5
67$1'$5'
67$786
+,6725<
)$8/76
$&.1$//
5(9(56(
-2*
6(732,17
63
92/7287
'&/1.9
&855287
①
Changing parameter values.
②
Basic commissioning