Basic Operator Panel 2 (BOP-2)
Operating Instructions, 02/2016, A5E37143404B AA
7
Changes in this manual
1
Important changes with respect to the Manual, Edition 02/2016
Listed below are all the changes that have been implemented in this manual.
The BOP-2 commissioning process
●
The commissioning process has been significantly enhanced to provide a more efficient
and adaptible commissioning experience. A detailed explanation of the new
commissioning process can be found at the following link:
●
New commissioning process
https://support.industry.siemens.com/cs/ww/en/view/109480663
Safety Notes
●
The Warning notification and been upgraded to a Danger notification:
Safety notes (Page 11)
Overview
●
List of compatible products has been updated:
●
Menu structure has been updated with the new commissioning process:
Setup Menu
●
SINAMICS G120 firmware update information included with links to the Siemens Industry
Online Support site giving detailed information to the nature and extent of the firmware
changes.
●
New standard commissioning process is explained.
Содержание SINAMICS BOP-2
Страница 1: ......
Страница 2: ......
Страница 6: ...Table of contents Basic Operator Panel 2 BOP 2 6 Operating Instructions 02 2016 A5E37143404B AA ...
Страница 8: ...Changes in this manual Basic Operator Panel 2 BOP 2 8 Operating Instructions 02 2016 A5E37143404B AA ...
Страница 12: ...Safety notes Basic Operator Panel 2 BOP 2 12 Operating Instructions 02 2016 A5E37143404B AA ...
Страница 32: ...Diagnostics Basic Operator Panel 2 BOP 2 32 Operating Instructions 02 2016 A5E37143404B AA ...
Страница 42: ...Setup Basic Operator Panel 2 BOP 2 42 Operating Instructions 02 2016 A5E37143404B AA ...
Страница 48: ...Extras Basic Operator Panel 2 BOP 2 48 Operating Instructions 02 2016 A5E37143404B AA ...
Страница 50: ...Technical data Basic Operator Panel 2 BOP 2 50 Operating Instructions 02 2016 A5E37143404B AA ...
Страница 53: ......
Страница 54: ......