
Commissioning
7
Observe the following when carrying out any work on the machine:
● Comply with the general safety instructions (Page 11)
● Comply with the applicable national and sector-specific regulations.
● When using the machine within the European Union, comply with the specifications laid
down in EN 50110‑1 regarding safe operation of electrical equipment.
7.1
Measures before start-up
NOTICE
Damage to the machine
In order to avoid material damage, check the following points before commissioning the motor:
● Using appropriate measures, check whether the correct direction of rotation of the motor
has been set by the customer, e.g. by decoupling from the driven load.
● Ensure that temperature-sensitive parts (cables, etc.) are not in contact with the machine
enclosure.
● Ensure that the condensation drain holes are always located at the lowest part of the motor.
NOTICE
Damage caused by insufficient cooling
Effective cooling is no longer possible if air guidance of the machine is not provided as
intended. This can damage the machine.
● Before commissioning, attach the covers to guarantee the intended air guidance.
Measures
Once the system has been correctly installed, you should check the following prior to
commissioning:
● Ensure that the machine has been correctly installed and aligned.
● Connect the machine corresponding to the specified direction of rotation.
● Ensure that the operating conditions match the data specified on the rating plate.
● Lubricate the bearings, depending on the version. Ensure that machines with rolling
bearings, which have been stored for longer than 12 months, are relubricated.
Also observe the notes in Chapter Preparation for use.
● Ensure that any optional supplementary machine monitoring equipment has been
connected correctly and is functioning as it should.
1MB5 SH 400/450
Operating Instructions, 05/2019, A5E45959221A
89
Содержание SIMOTICS XP 1MB5 SH400
Страница 2: ......
Страница 10: ...Table of contents 1MB5 SH 400 450 8 Operating Instructions 05 2019 A5E45959221A ...
Страница 64: ...Assembly 5 4 Aligning and fixing the machine 1MB5 SH 400 450 62 Operating Instructions 05 2019 A5E45959221A ...
Страница 106: ...Operation 8 8 Non operational periods 1MB5 SH 400 450 104 Operating Instructions 05 2019 A5E45959221A ...
Страница 154: ...Disposal 11 5 Disposal of components 1MB5 SH 400 450 152 Operating Instructions 05 2019 A5E45959221A ...
Страница 156: ...Service support 1MB5 SH 400 450 154 Operating Instructions 05 2019 A5E45959221A ...
Страница 160: ...Quality documents 1MB5 SH 400 450 158 Operating Instructions 05 2019 A5E45959221A ...
Страница 165: ......
Страница 166: ...Germany More information www siemens com drives Siemens AG Digital Industries Postfach 48 48 90026 NÜRNBERG ...