
Start-up
7.1 Measures before commissioning
1MB155 / 1MB555
Operating Instructions, 03/2018, A5E41926185A
83
●
Any supplementary motor monitoring devices and equipment have been correctly
connected and are functioning correctly.
●
In continuous operation, the motor cannot exceed the specified upper speed limit n
max
or
undershoot the lower speed limit n
min
.
The permissible acceleration time to the limit speed n
min
depends on the parameter
assignment.
7.1.1
Insulation resistance and polarization index
Measuring the insulation resistance and polarization index (PI) provides information on the
condition of the machine. It is therefore important to check the insulation resistance and the
polarization index at the following times:
●
Before starting up a machine for the first time
●
After an extended period in storage or downtime
●
Within the scope of maintenance work
The following information is provided regarding the state of the winding insulation:
●
Is the winding head insulation conductively contaminated?
●
Has the winding insulation absorbed moisture?
As such, you can determine whether the machine needs commissioning or any necessary
measures such as cleaning and/or drying the winding:
●
Can the machine be put into operation?
●
Must the windings be cleaned or dried?
Detailed information on testing and the limit values can be found here:
"Testing the insulation resistance and polarization index" (Page 84)
Содержание SIMOTICS XP 1MB155
Страница 1: ......
Страница 2: ......
Страница 10: ...Table of contents 1MB155 1MB555 8 Operating Instructions 03 2018 A5E41926185A ...
Страница 66: ...Assembly 5 4 Installing the machine 1MB155 1MB555 64 Operating Instructions 03 2018 A5E41926185A ...
Страница 82: ...Electrical connection 6 8 Final checks 1MB155 1MB555 80 Operating Instructions 03 2018 A5E41926185A ...
Страница 94: ...Start up 7 2 Switching on 1MB155 1MB555 92 Operating Instructions 03 2018 A5E41926185A ...
Страница 108: ...Operation 8 6 faults 1MB155 1MB555 106 Operating Instructions 03 2018 A5E41926185A ...
Страница 126: ...Maintenance 9 2 Corrective Maintenance 1MB155 1MB555 124 Operating Instructions 03 2018 A5E41926185A ...
Страница 142: ...Disposal 11 4 Disposal of components 1MB155 1MB555 140 Operating Instructions 03 2018 A5E41926185A ...
Страница 144: ...Service and Support 1MB155 1MB555 142 Operating Instructions 03 2018 A5E41926185A ...
Страница 148: ...Quality documents C 1 Quality documents SIMOTICS in SIOS 1MB155 1MB555 146 Operating Instructions 03 2018 A5E41926185A ...
Страница 152: ......