![Siemens SIMOTICS M-1PH1 Скачать руководство пользователя страница 100](http://html.mh-extra.com/html/siemens/simotics-m-1ph1/simotics-m-1ph1_equipment-manual_379037100.webp)
Operation
9.2 Non-operational periods
1PH1 main motors
98
Equipment Manual, 09/2021, A5E51077676A-AA
9.2
Non-operational periods
NOTICE
Damage due to improper storage
The motor can be damaged if it is not stored properly.
• If the motor is not operational for longer periods of time, preserve it by using anti-
corrosion protection and ensure that it remains dry (for example, appropriate drying
agents).
Measures for long non-operational periods:
• If the motor is not operational for extended periods of time, run it at regular intervals
(roughly once a month) or spin the rotor by hand.
• When recommissioning after longer non-operational periods of the motor, perform the
checks and measures listed in Chapter, "Commissioning (Page 89)".
• Before switching on to commission the drive, carefully read the Section "Switching on" in
the Chapter "Switching on and switching off (Page 94)".
Содержание SIMOTICS M-1PH1
Страница 1: ......
Страница 2: ......
Страница 8: ...Introduction 6 1PH1 main motors Equipment Manual 09 2021 A5E51077676A AA ...
Страница 12: ...Table of contents 1PH1 main motors 10 Equipment Manual 09 2021 A5E51077676A AA ...
Страница 90: ...Configuration 7 3 Selecting motors 88 1PH1 main motors Equipment Manual 09 2021 A5E51077676A AA ...
Страница 108: ...Maintenance 10 6 Cleaning the motor and the external fan 1PH1 main motors 106 Equipment Manual 09 2021 A5E51077676A AA ...
Страница 133: ......
Страница 134: ......