5.5
Complete the installation work
1. Check that all of the screw connections are correctly tightened.
2. Once you have completed the installation work, remove all objects – such as tools, cloths,
deposits of dirt and moisture, etc. – from the machine.
3. Clean the machine to remove any dirt that may have accumulated as a result of the
installation work.
4. Protect all exposed rotating parts against contact by persons. Cover any open shaft ends,
couplings and belt drives, etc.
5. Make sure that there are no loose parts on or in rotating machine elements. Observe any
feather keys that may be located in free shaft ends.
Record all of the installation work that was carried out.
Assembly
5.5 Complete the installation work
SIMOTICS HV M 1RN76308PR900CG0-Z
Operating Instructions 07/2018
57
Содержание SIMOTICS HV M
Страница 2: ...03 07 2018 13 28 V3 00 ...
Страница 22: ...Description SIMOTICS HV M 1RN76308PR900CG0 Z 22 Operating Instructions 07 2018 ...
Страница 58: ...Assembly 5 5 Complete the installation work SIMOTICS HV M 1RN76308PR900CG0 Z 58 Operating Instructions 07 2018 ...
Страница 86: ...Operation 8 11 Faults SIMOTICS HV M 1RN76308PR900CG0 Z 86 Operating Instructions 07 2018 ...
Страница 108: ...Maintenance 9 2 Corrective Maintenance SIMOTICS HV M 1RN76308PR900CG0 Z 108 Operating Instructions 07 2018 ...
Страница 120: ...Disposal 11 4 Disposal of components SIMOTICS HV M 1RN76308PR900CG0 Z 120 Operating Instructions 07 2018 ...
Страница 122: ...Service and Support SIMOTICS HV M 1RN76308PR900CG0 Z 122 Operating Instructions 07 2018 ...
Страница 128: ...Quality documents SIMOTICS HV M 1RN76308PR900CG0 Z 128 Operating Instructions 07 2018 ...
Страница 130: ...Additional documents SIMOTICS HV M 1RN76308PR900CG0 Z 130 Operating Instructions 07 2018 ...
Страница 135: ......