Start-up
7
Observe the following when carrying out any work on the machine:
● Comply with the general safety instructions
● Comply with the applicable national and sector-specific regulations at the place of
installation
● When using the machine within the European Union, comply with the specifications laid
down in EN 50110‑1 regarding safe operation of electrical equipment.
See also
7.1
Checks to be carried out prior to commissioning
Once the system has been correctly installed, you should check the following prior to
commissioning:
Note
Checks to be carried out prior to commissioning
The following list of checks to be performed prior to commissioning does not claim to be
complete. It may be necessary to perform further checks and tests in accordance with the
specific situation on-site.
● The machine is undamaged.
● The machine has been correctly installed and aligned, the transmission elements are
correctly balanced and adjusted.
● All fixing screws, connection elements, and electrical connections have been tightened to
the specified tightening torques.
● The operating conditions match the data provided in accordance with the technical
documentation, such as degree of protection, ambient temperature, etc..
● Moving parts such as the coupling move freely.
● All touch protection measures for moving and live parts have been taken.
Second shaft extension
If the second shaft extension is not used:
● The feather key is secured to prevent it from being thrown out, and for balancing type "H"
(standard type), its weight is reduced to 60 % of the original weight.
● The unused shaft extension is covered and protected against accidental contact.
SIMOTICS FD 1MH1
Operating Instructions 08/2017
105
Содержание SIMOTICS FD 1LL1
Страница 2: ...18 08 2017 17 24 V10 00 ...
Страница 32: ...Description 3 1 Comparison of IEC and GOST standards SIMOTICS FD 1MH1 32 Operating Instructions 08 2017 ...
Страница 58: ...Preparations for use 4 19 Converter operation SIMOTICS FD 1MH1 58 Operating Instructions 08 2017 ...
Страница 104: ...Electrical connection 6 6 Connecting the auxiliary circuits SIMOTICS FD 1MH1 104 Operating Instructions 08 2017 ...
Страница 120: ...Start up 7 10 Setting the motor parameters at the converter SIMOTICS FD 1MH1 120 Operating Instructions 08 2017 ...
Страница 176: ...Disposal 11 4 Disposal of components SIMOTICS FD 1MH1 176 Operating Instructions 08 2017 ...
Страница 178: ...Service and Support SIMOTICS FD 1MH1 178 Operating Instructions 08 2017 ...
Страница 182: ...Quality documents SIMOTICS FD 1MH1 182 Operating Instructions 08 2017 ...
Страница 187: ......