6.5.2
Bringing cables into the terminal box 1XB... with sealing insert with break-off ring
The 1XB1621, 1XB1631 terminal boxes can be equipped optionally with a sealing insert with
break-off ring. The connecting cable is sealed at the cable entry location using a cut-out sealing
insert and is fastened using a strain relief device.
Bringing cables into the terminal box and connecting them
The terminal box is opened, the cable cut to the correct length and stripped back. Make sure
that no external forces are acting on the cable connection.
1P
ཱ
ི
Figure 6-9
Strain relief device and sealing insert
Proceed as follows when connecting the cables:
1. Remove the top part of the strain relief
③
and release the fixing screws for the bottom part
of the strain relief
②
. The strain relief device can be located either in the terminal box or
externally. If necessary, switch the direction sense of the strain relief device.
2. Cut the seal insert
①
so that its opening is 1 to 3 mm smaller than the diameter of the cable.
3. Pull the sealing insert over the end of the cable.
4. Prepare the end of the cable depending on the cable and its use, e.g. with a cable lug.
5. Connect the ends of the cables to the terminals in accordance with the circuit diagram.
The circuit diagram is located in the cover of the terminal box.
Refer to the "Connecting cables..." section for more information.
6. You might need to use a sleeve made of suitable sealing tape to modify the diameter where
it passes through the sealing insert. Push the sealing insert onto the prepared sleeve.
7. Insert the cable with the seal insert in position into the gland opening. Screw the strain relief
device together once the cable is in a concentric position in the gland opening.
8. Secure the strain relief device.
Electrical connection
6.5 Inserting and routing the cables
SIMOTICS FD 1LH1
Operating Instructions 01/2019
87
Содержание SIMOTICS FD 1LH1
Страница 2: ...23 01 2019 19 26 V11 01 ...
Страница 28: ...Description SIMOTICS FD 1LH1 28 Operating Instructions 01 2019 ...
Страница 72: ...Assembly 5 5 Connecting the cooling water supply SIMOTICS FD 1LH1 72 Operating Instructions 01 2019 ...
Страница 122: ...Operation 8 10 faults SIMOTICS FD 1LH1 122 Operating Instructions 01 2019 ...
Страница 140: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1LH1 140 Operating Instructions 01 2019 ...
Страница 162: ...Disposal 11 5 Disposal of components SIMOTICS FD 1LH1 162 Operating Instructions 01 2019 ...
Страница 164: ...Service and Support SIMOTICS FD 1LH1 164 Operating Instructions 01 2019 ...
Страница 168: ...Quality documents SIMOTICS FD 1LH1 168 Operating Instructions 01 2019 ...
Страница 173: ......