9.1.2
Measuring the insulation resistance during the course of maintenance work
Measuring the insulation resistance and polarization index (PI) provides information on the
condition of the machine. It is therefore important to check the insulation resistance and the
polarization index at the following times:
● Before starting up a machine for the first time
● After an extended period in storage or downtime
● Within the scope of maintenance work
The following information is provided regarding the state of the winding insulation:
● Is the winding head insulation conductively contaminated?
● Has the winding insulation absorbed moisture?
As such, you can determine whether the machine needs commissioning or any necessary
measures such as cleaning and/or drying the winding:
● Can the machine be put into operation?
● Must the windings be cleaned or dried?
Detailed information on testing and the limit values can be found here:
"Testing the insulation resistance and polarization index" (Page 55)
9.1.3
Inspections in the event of faults
Natural disasters or unusual operating conditions, such as overloading or short circuit, are
faults that overload the machine electrically or mechanically.
Immediately perform an inspection after such faults.
9.1.4
First service after installation or repair
Perform the following checks after approximately 500 operating hours or at the latest six
months after commissioning:
Table 9-1
Checks after assembly or repair
Check
When the
motor is
running
At stand‐
still
The stated electrical characteristics are being observed.
X
The permissible bearing temperatures are not exceeded (Page 101).
X
The smooth running characteristics and machine running noise have not
deteriorated.
X
The motor foundation has no cracks and indentations. (*)
X
X
(*) You can perform these checks while the motor is running or at a standstill.
Maintenance
9.1 Inspection and maintenance
SIMOTICS FD 1LH1
Operating Instructions 01/2019
125
Содержание SIMOTICS FD 1LH1
Страница 2: ...23 01 2019 19 26 V11 01 ...
Страница 28: ...Description SIMOTICS FD 1LH1 28 Operating Instructions 01 2019 ...
Страница 72: ...Assembly 5 5 Connecting the cooling water supply SIMOTICS FD 1LH1 72 Operating Instructions 01 2019 ...
Страница 122: ...Operation 8 10 faults SIMOTICS FD 1LH1 122 Operating Instructions 01 2019 ...
Страница 140: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1LH1 140 Operating Instructions 01 2019 ...
Страница 162: ...Disposal 11 5 Disposal of components SIMOTICS FD 1LH1 162 Operating Instructions 01 2019 ...
Страница 164: ...Service and Support SIMOTICS FD 1LH1 164 Operating Instructions 01 2019 ...
Страница 168: ...Quality documents SIMOTICS FD 1LH1 168 Operating Instructions 01 2019 ...
Страница 173: ......