• Avoid rigid couplings.
• Repair any damage to the paint, this must be done immediately and correctly.
5.5.1
Measures for alignment and mounting
The following measures are required in order to compensate any radial offset at the coupling and
to horizontally adjust the electrical machine with respect to the driven load:
• Vertical positioning
For vertical mounting positions, avoid deforming the machines by placing shims under the
mounting feet. Keep the number of shims low; only use a few stacked shims.
• Horizontal positioning
To position the machine horizontally, shift it sideways on the foundation and ensure that the
axial position is maintained (angularity error).
• When positioning the motor, ensure that a uniform axial gap is maintained around the
coupling.
• Smooth running
Preconditions for smooth, vibration-free operation:
– Stable foundation design free of any shock or vibration.
– A precisely aligned coupling.
– A well-balanced drive output element (coupling, belt pulleys, fans, ...)
Maintain the maximum permissible vibration values in operation according to ISO 10816-3.
Avoid inadmissible vibration caused by imbalance, for example (drive output element),
external vibration or any resonance over the complete speed range.
It may be necessary to completely balance the machine with the drive output element or the
system resonance frequency must be shifted.
• Foot mounting/flange mounting
– Use the specified thread size laid down in EN 50347 when flanging the machine to a
foundation or a machine flange.
– Mount the machine at all the foot or flanged holes provided. The choice of fixing elements
depends on the foundation and is the plant operator's responsibility. Comply with the
required property classes for screwed connections and materials for fixing elements.
– Select the correct screw length for IM B14 flanges.
– Ensure that the screw heads are in full contact with the flange surface. Use additional flat
washers (ISO 7093), especially for elongated foot mounting holes.
Assembly
5.5 Aligning and fixing the machine
1FZ shaft height 280
Operating Instructions, 02/2022, A5E51698698A
55
Содержание SIMOTICS DP
Страница 2: ......
Страница 30: ...Description 3 3 Installation 1FZ shaft height 280 28 Operating Instructions 02 2022 A5E51698698A ...
Страница 48: ...Preparing for use 4 13 Converter operation 1FZ shaft height 280 46 Operating Instructions 02 2022 A5E51698698A ...
Страница 64: ...Assembly 5 6 Installing the machine 1FZ shaft height 280 62 Operating Instructions 02 2022 A5E51698698A ...
Страница 78: ...Electrical connection 6 8 Final checks 1FZ shaft height 280 76 Operating Instructions 02 2022 A5E51698698A ...
Страница 116: ...Maintenance 9 3 Corrective maintenance 1FZ shaft height 280 114 Operating Instructions 02 2022 A5E51698698A ...
Страница 124: ...4 4 Spare parts 10 8 Exploded drawings 1FZ shaft height 280 122 Operating Instructions 02 2022 A5E51698698A ...
Страница 130: ...Disposal 11 7 Disposal of components 1FZ shaft height 280 128 Operating Instructions 02 2022 A5E51698698A ...
Страница 140: ...Index 1FZ shaft height 280 138 Operating Instructions 02 2022 A5E51698698A ...
Страница 141: ......