Commissioning
7.4 Switching on
Smoke extraction motors
60
Operating Instructions, 03/2016, 5 610 80000 40 018
7.4
Switching on
Measures for start-up
After installation or inspections, the following measures are recommended for normal start-
up of the machines:
●
Start the machine without a load. To do this, close the circuit breaker and do not switch
the machine off prematurely. Switching the machine off again while it is starting up and
still running at slow speed should be kept to a bare minimum, for example for checking
the direction of rotation or for checking in general. Allow the machine to run to a standstill
before switching it back on again.
●
Check mechanical operation for noise or vibration at the bearings or end shields.
●
If the machine is not running smoothly or is emitting abnormal noises, switch it off, and
determine the cause of the fault as it runs down.
●
If mechanical operation improves immediately after the machine is switched off, then the
cause is magnetic or electrical, e.g. voltage imbalance, magnetic imbalance. If
mechanical operation does not improve immediately after switching the machine off, then
the cause is mechanical, e.g. an imbalance in the electrical machines or in the driven
machine, inadequate alignment of the machine set, operation of the machine with the
system resonating (system = m base frame + foundations etc.).
●
If the machine runs perfectly in terms of its mechanical operation, switch on any cooling
devices present and continue to monitor the machine for a while as it idles.
●
If it runs perfectly, connect a load. Check that it runs smoothly.
Read off and document the values for voltage, current, and power.
Where possible, read off corresponding values for the driven machine and document
them as well.
●
Monitor the bearing temperature, winding temperature, etc. until the system reaches a
steady state.
Document these, provided this is possible with existing measuring instruments.
Commissioning measures for smoke extraction motors according to EN 12101-3
●
The procedures laid down in EN 12101-3 must be complied with when testing the motors,
installed in the fan unit.
●
Plot the input power curve and temperature-time characteristic in the fire testing room.
Record the vibration response at the end shields radially in at least one direction
according to ISO 10816 throughout the entire test period.
Do not exceed the values specified in the Balancing chapter.
●
When installing in the fire testing room, avoid directly exposing the unit, machine and
cable to flames.
Avoid abrasion points of connection cables and cables on metallic components.
Содержание SIMOTICS DP 1PC13
Страница 1: ......
Страница 2: ......
Страница 68: ...Operation 8 4 Deactivating Smoke extraction motors 68 Operating Instructions 03 2016 5 610 80000 40 018 ...
Страница 94: ...Service and Support A 2 SIOS App Smoke extraction motors 94 Operating Instructions 03 2016 5 610 80000 40 018 ...
Страница 99: ......
Страница 100: ......