Maintenance
9.6 Inspection
1FU8
80
Operating Instructions, 02/2016, 5 610 70000 02 000
9.5.3
Touch up any damaged paintwork
If the paint is damaged, it must be repaired in order to protect the unit against corrosion.
Note
Paint system
Contact the Service Center before you repair any paint damage. They will provide you with
more information about the correct paint system and methods of repairing paint damage.
9.6
Inspection
9.6.1
General inspection specifications
Notes
Note
Pay particular attention to the relubrication intervals for rolling bearings that deviate from the
inspection intervals.
Note
When servicing a three-phase machine, it is generally not necessary to dismantle it. The
machine only has to be dismantled if the bearings are to be replaced.
9.6.2
Optional built-on accessories
See the list of additional operating instructions: Further documents (Page 103)
9.6.3
First inspection after installation or maintenance
Perform the following checks after approximately 500 operating hours or at the latest six
months after commissioning:
Table 9- 1
Checks after assembly or repair
Check
When the
motor is
running
At stand-
still
The stated electrical characteristics are being observed.
X
The permissible bearing temperatures are not exceeded.
X
The smooth running characteristics and machine running noise have not
deteriorated.
X
The motor foundation has no cracks and indentations. (*)
X
X
(*) You can perform these checks while the motor is running or at a standstill.
Содержание SIMOTICS A 1FU8
Страница 1: ......
Страница 2: ......
Страница 10: ...Inhaltsverzeichnis 1FU8 10 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 12: ...Einleitung 1 1 Über diese Anleitung 1FU8 12 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 30: ...Beschreibung 3 3 Aufbau 1FU8 30 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 80: ...Betrieb 8 4 Ausschalten 1FU8 80 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 102: ...Ersatzteile 10 6 Explosionszeichnungen 1FU8 102 Betriebsanleitung 02 2016 5 610 70000 02 000 10 6 2 1FU8 BG 112M 160L ...
Страница 106: ......
Страница 108: ...Service Support A 3 Weitere Dokumente 1FU8 108 Betriebsanleitung 02 2016 5 610 70000 02 000 ...
Страница 112: ......
Страница 115: ......
Страница 116: ......
Страница 124: ...Table of contents 1FU8 10 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 126: ...Introduction 1 1 About these instructions 1FU8 12 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 142: ...Description 3 3 Installation 1FU8 28 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 150: ...Preparing for use 4 7 Converter operation 1FU8 36 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 164: ...Assembly 5 5 Alignment and fastening 1FU8 50 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 206: ...Maintenance 9 8 Corrective maintenance 1FU8 92 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 212: ...Spare parts 10 6 Exploded drawings 1FU8 98 Operating Instructions 0302 2016 5 610 70000 02 000 10 6 2 1FU8 FS 112M 160L ...
Страница 216: ...Disposal 11 4 Disposal of components 1FU8 102 Operating Instructions 0302 2016 5 610 70000 02 000 ...
Страница 218: ...Service support A 3 Further documents 1FU8 104 Operating Instructions 02 2016 5 610 70000 02 000 ...
Страница 225: ......
Страница 226: ......