4. If necessary, rotate the machine into the right position so that the clearance holes in the
flange are central to the tapped holes.
5. Move the machine fully up against the mating flange so that it is fully in contact.
6. Fix the machine using the flange fixing bolts, finishing by replacing the studs.
5.3.2.3
Vertical types of construction with flange
The standard flange is provided with a centering. The choice of fit for the mating flange on the
driven machine is the system manufacturer's or the plant operator's responsibility.
Note
If the machine is not fitted with a standard flange, align the machine to suit the driven machine.
Procedure
The machine axis must be vertical when it is lifted and the flange must be parallel to the mating
flange, so as to avoid seizing and stressing. Otherwise damage to the centering will result.
1. Grease the centering flange with assembly paste to make the process easier.
2. Screw in two studs into tapped holes on opposite sides of the driven machine flange. The
studs act as positioning aids.
3. Lower the machine slowly toward the driven machine and into the centering, so that the
flanges do not quite touch. Lowering too quickly risks damaging the centering.
4. If necessary, rotate the machine into the right position so that the clearance holes in the
flange are central to the tapped holes.
5. Lower the machine completely onto the mating flange so that it is fully in contact; then
remove the studs.
6. Fix the machine using the flange fixing bolts.
5.3.3
Alignment accuracy
The alignment accuracy required depends essentially on the configuration of the overall
machine train. Observe the required alignment accuracy of the coupling manufacturer in all
cases when aligning the machine.
Table 5-1
Recommended alignment accuracy
Speed [
rpm
]
Parallel offset [mm]
Angular offset [mm per 100 mm
coupling diameter]
750
0.09
0.09
1500
0.06
0.05
3000
0.03
0.025
Assembling
5.3 Installing the machine
LOHER CHEMSTAR 1PS5
Operating Instructions 03/2014
51
Содержание SIMATIC S5 1P 243
Страница 2: ...11 03 2014 02 49 V4 00 ...
Страница 12: ...Introduction LOHER CHEMSTAR 1PS5 12 Operating Instructions 03 2014 ...
Страница 20: ...Safety notes 2 11 Ventilation LOHER CHEMSTAR 1PS5 20 Operating Instructions 03 2014 ...
Страница 42: ...Preparations for use 4 11 Converter operation LOHER CHEMSTAR 1PS5 42 Operating Instructions 03 2014 ...
Страница 66: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS5 66 Operating Instructions 03 2014 ...
Страница 124: ...Disposal 11 4 Disposal of components LOHER CHEMSTAR 1PS5 124 Operating Instructions 03 2014 ...
Страница 126: ...Service and Support A 1 Siemens Service Center LOHER CHEMSTAR 1PS5 126 Operating Instructions 03 2014 ...
Страница 136: ...Quality documents C 4 Data LOHER CHEMSTAR 1PS5 136 Operating Instructions 03 2014 ...
Страница 140: ...Index LOHER CHEMSTAR 1PS5 140 Operating Instructions 03 2014 ...
Страница 141: ...AC EC Declaration of Conformity U161 AB EC Declaration of Conformity U163 AA R No 20000h U165 ...