7.3.5
Optimizing the run sequence
Introduction
PCS 7 SMART provides you with a function for optimizing the run sequence based on the data
flow. You can use this function when you have completed the CFC and SFC configuration.
Note
Optimizing the run sequence of the blocks
If there is more than one automation system in a project, follow the steps outlined below for
each automation system.
Prerequisites
● The color_gs project is open in SIMATIC Manager.
● The plant view is activated.
Procedure
1. In the tree view, select any folder where you have saved a CFC.
2. Select a CFC chart from the detail view and then select the menu command Options >
Charts > Run Sequence.
The chart opens in the CFC Editor.
3. Select Options > Optimize Run Sequence.
The message dialog "The run sequence of the blocks will be changed...." opens.
4. Click "OK".
The run sequence is optimized.
5. Close the CFC Editor.
Creating SFCs
7.3 Setting parameters
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
Getting Started, 12/2017, A5E42181435-AA
127