Assembling the M7-400
8-42
S7-400 and M7-400 Programmable Controllers Hardware and Installation
A5E00069481-04
Programming Device for Commissioning or Servicing
For commissioning or servicing purposes, connect the programming device via a
spur line to a node on the MPI subnet. The bus connector of this node must have a
programming device socket for this (see also Chapter 5).
Figure 8-19 shows a network with two M7-400s, to which a programming device is
connected.
PROFIBUS-DP bus cable
PG cable = spur line
M7-400
M7-400
Programmin
g device
Figure 8-19
Connecting a Programming Device to an M7-400 Subnet
Содержание Simatic M7-400
Страница 10: ...Preface x S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 20: ...Contents xx S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 66: ...Installing the S7 400 2 40 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 74: ...Addressing the S7 400 3 8 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 118: ......
Страница 170: ...Starting Up 6 20 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 194: ...Maintenance 7 24 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 252: ...Assembling the M7 400 8 58 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 310: ...Glossary Glossary 18 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...
Страница 316: ...Index Index 6 S7 400 and M7 400 Programmable Controllers Hardware and Installation A5E00069481 04 ...