SIMATIC IPC547C
Getting Started, 06/2009, A5E02411398-01
25
Commissioning
6
6.1
Requirements for commissioning
● Before you switch on the device, you should verify that all peripheral devices such the
keyboard, mouse, monitor and the power supply are connected.
● The operating system of your device is preinstalled on the hard disk.
CAUTION
Risk of damage to the device!
Make sufficient allowances for the device to acquire room temperature before you put it
into use. If condensation develops, wait at least 12 hours before switching on the
device.
Содержание SIMATIC IPC547C
Страница 4: ...Table of contents SIMATIC IPC547C 4 Getting Started 06 2009 A5E02411398 01 ...
Страница 6: ...Introduction SIMATIC IPC547C 6 Getting Started 06 2009 A5E02411398 01 ...
Страница 24: ...Connecting 5 2 Connecting the device to power SIMATIC IPC547C 24 Getting Started 06 2009 A5E02411398 01 ...
Страница 28: ...Commissioning 6 3 Reinstalling the software SIMATIC IPC547C 28 Getting Started 06 2009 A5E02411398 01 ...
Страница 36: ...SIMATIC Industrial PC SIMATIC IPC547C Getting Started 06 2009 A5E02411398 01 36 ...