
8.1.2
Using the reset button
8.1.2.1
Switching on the CPU module
Requirement
• You have adhered to the basics for mounting.
• The supply voltage is connected to the rack.
• For power-on again: The CPU has been switched off before via the reset button.
Procedure for commissioning after connection
Switch on the supply voltage.
Procedure for power-on again
Press the reset button.
Result
The CPU module is switched on and the system starts.
8.1.2.2
Restarting the CPU module
Requirement
• You have adhered to the basics for mounting.
• The supply voltage is connected to the rack.
• The CPU module has been started.
Procedure
Press the reset button.
Result
The system restarts.
Operation
8.1 Operating the CPU module
CN 4100 Communication System
52
Equipment Manual, 10/2021, A5E50871363-AA
Содержание SIMATIC CN 4100
Страница 6: ...Table of contents CN 4100 Communication System 6 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 8: ...Security information CN 4100 Communication System 8 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 50: ...Commissioning 7 2 Phases CN 4100 Communication System 50 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 56: ...Operation 8 3 LEDs of the RJ45 port CN 4100 Communication System 56 Equipment Manual 10 2021 A5E50871363 AA ...