9. Is the name of the batch process cell in all projects of the CMP identical to the process cell
name on the MP level? Is the correct master data library integrated?
– Compare the project names within both multiprojects. Compare the project names within
the CMP with the project names within the DMP. The names must be identical.
– Compare the names in the master data library within both multiprojects.
10.Compile and download the AS of your inserted project.
11.Adapt your OS and then compile and download it.
12.Update the batch process cell, generate and propagate the batch types, merge the batch
instances, transfer the messages to the OS and download the Batch data.
13.Update the Batch data in the Batch Control Center (BCC).
Note
To make sure that you update the batch data without errors, do not change the names of
type objects, phase types etc. If you do, you will need to adapt the object assignment
manually in the "Update process cell" dialog in the Batch Control Center.
Result
You have transferred a CMPs from a central ES to a multiproject on a distributed ES. To test
the newly configured functions in process mode, you have created a new S7 connection,
compiled all ES data and downloaded it to the AS. You have also updated the batch process
cell and distributed the Batch data to the respective components. You have created a new
batch process cell and recipes to run the batches.
8.5.4
Step 3: Editing, testing and archiving project(s) in the DMP
Introduction
You would like to edit the inserted project and test it in process mode. Then you want to archive
the project for transfer to the CMP. Leave the transfer project and the master data library in
the DMP for any changes that may be required.
Procedure
Once all tests are completed, archive the project as a user project in a new project path and
close all projects.
File > Archive > select project > OK > select archive and path > Save.
Result
You have continued editing of the project(s) and performed testing in process mode. You then
archived the project as a user project to reinsert into the CMP.
Rational engineering
8.5 Distributed multiproject engineering
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA
235
Содержание SIMATIC BATCH
Страница 30: ...Security information SIMATIC BATCH V8 2 30 Operating Manual 02 2016 A5E35958174 AA ...
Страница 135: ...Example Engineering 7 1 Basic engineering for PCS 7 SIMATIC BATCH V8 2 Operating Manual 02 2016 A5E35958174 AA 135 ...
Страница 403: ...BATCH Control Center 9 8 Batch control SIMATIC BATCH V8 2 Operating Manual 02 2016 A5E35958174 AA 403 ...
Страница 584: ...BATCH Recipe Editor 10 5 Other functions SIMATIC BATCH V8 2 584 Operating Manual 02 2016 A5E35958174 AA ...
Страница 722: ...Appendix 13 4 Command line parameters for BatchCC SIMATIC BATCH V8 2 722 Operating Manual 02 2016 A5E35958174 AA ...
Страница 1158: ...Index SIMATIC BATCH V8 2 1158 Operating Manual 02 2016 A5E35958174 AA ...