
150
SICAM Q80 7KG8080
Power Quality Recorder SICAM Q80 7KG8080, System manual
E50417-H1076-C420-A2, Release 12.01.2015
5.1.7.2.1 Setting up Autoreport as a Windows task
1.
In
SICAM Q80 Manager
, select the item
Extras \ Options \ Evaluation Automated report.
2.
Confirm the settings by clicking on the button
Setup
under
Set the evaluation schedule.
Dialog Options \ Evaluation: Set the evaluation schedule
3.
The Windows Planner
Scheduled Tasks.
Select
Add Scheduled Task.
Planning program Windows Tasks