
5 Energy Management
5.1 Load-Profile Determination
88
SICAM Q100, 7KG95xx, Device Manual
E50417-H1040-C522-A6, Edition 06.2019
5.1.4
Current Load-Profile Data at the Communication Interfaces and in the User
Interface
The load-profile data of the current and last completed periods are output at the communication interfaces.
For information on the data transmission via the communication protocols Modbus TCP, Modbus RTU Master,
and IEC 61850, refer to the System Manual SICAM Q100.
In the user interface, the load-profile data are displayed in the tab
Value view and evaluation
->
Load profile
;
MAN_SICAM_Q100_US.book Page 88 Wednesday, June 5, 2019 9:31 AM