background image

s

Power Panel / Switchboard Kit

for Branch Mounting

Type GB2 Breakers

Installation

Instructions

12-A-1031-01 Rev. 00

-4- 

These instructions do not purport to cover all details or variations in equipment, or to provide for every possible 

contingency to be met in connection with installation, operation or maintenance.  Should further information be

desired or should particular problems arise, which are not covered sufficiently for the purchaser’s purposes, the

matter should be referred to the local 

Siemens

 sales office.  The contents of this instruction manual shall not 

become part of or modify any prior or existing agreement, commitment or relationship.  The sales contract

contains the entire obligation of 

Siemens

.  The warranty contained in the contract between the parties is the sole

warranty of 

Siemens

.  Any statements contained herein do not create new warranties or modify the existing warranty.

Trademarks - Unless otherwise noted, all names identified by 

®

 are registered trademarks of 

Siemens AG

 or

Siemens Industry, Inc

.  The remaining trademarks in this publication may be trademarks whose use by third

parties for their own purposes could violate the rights of the owner.

SGB2 / SGB2D

10.  

Reference Figure 7

       If branch neutral terminal strips (Item 18) are

       NOT already installed -- or are full -- then the

       branch neutral terminal strip (included) must

       be installed.  Depending upon the feed location,

       the branch neutral can be mounted near the

       bottom of the Z-rails -- or mirrored to the top --

       on a branch neutral connector.  Panelboards

       should have one mounted already.  On Switch-

       boards, mount the branch neutral connector

       (Item 17) on the neutral bus using (2) 1/4”-20

       screws (Item 15).  Mount the neutral terminal

       strip (Item 18) on either side of the branch

       neutral connector using (2) #8-32 screws

       (Item 16).  Torque all hardware as follows:

       For 1/4”-20 screws, refer to torque on label.

       For #8-32 screws, torque to 35 lb-in.

INSTALLING THE NEUTRAL COMPONENTS

12.  

Reference Figure 8

       Install the 3.75” cover plate (Item 7) by aligning

       it over the 3.75” of selected unit space and

       related breakers.  Use a 1/4”-20 x 3/8” screw

       (Item 14) on each side of the cover plate and

       drive into the deadfront rails.  Torque all hardware

       as specified on the rear of the deadfront.  Mark

       the circuit ID cards (Item 8) as desired and

       mount them to the cover plate by placing each

       behind a clear card holder (Item 9) and pushing

       the two into the proper pair of holes in the cover

       plate next to the proper circuit.  Repeat for each

       location.  Finally, use blank fillers (Item 10) at

       every location that doesn’t have a breaker

       penetrating through the cover plate.

       NOTE:  Other cover plates may be required for

       proper fit.  See filler plate kits listed on the rear

       of the deadfront.

         

INSTALLING COVER PLATE AND FILLERS

13.  Ensure that any bus or breaker hardware is

       torqued as specified on the rear of the deadfront.

       Then replace all the cover plates and gutter

       covers.  Finally, ensure any fillers are in place

       

BEFORE

 re-energizing the equipment.  

COMPLETING THE INSTALLATION

8

9

10

14

7

Figure 8

(to

deadfront

rail)

Figure 7

PANELBOARD

REFERENCE

SWITCHBOARD

REFERENCE

11.  Reassemble the deadfront assembly to the

       interior (removed in Step 3).

WARNING:  Do NOT use with NGB, LGB or HGB breakers.  ONLY use with NGB2, LGB2 or HGB2 breakers.